# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) (Correction) Order 2023, Article 2: Corrections


The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 is corrected as set out in the table in the Schedule to this Order, where—
(a) column 1 sets out where the correction is to be made;
(b) column 2 sets out how the correction is to be made; and
(c) column 3 sets out the text to be substituted, inserted or omitted.

---
Source: https://www.legislation.gov.uk/uksi/2023/442/article/2 (the official version)
Page: https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-correction-order-2023/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

