# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, Paragraph 20: Fencing

Extent: E+W+S

Where so required by the engineer the undertaker must to the reasonable satisfaction of the engineer fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterway, whether on a temporary or permanent basis or both.

---
Source: https://www.legislation.gov.uk/uksi/2022/1396/schedule/10/paragraph/20 (the official version)