{
  "url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-13/paragraph-16",
  "json_url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-13/paragraph-16.json",
  "legislation": "uksi/2022/1396",
  "legislation_title": "The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022",
  "legislation_url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022",
  "path": "schedule/13/paragraph/16",
  "kind": "paragraph",
  "number": "16",
  "heading": "During Construction, Operation and Maintenance",
  "text": "The undertaker must not discharge waste concrete slurry or wash water from concrete or cement into the river. The undertaker must site concrete and cement mixing and washing areas at least 10 metres from the river or surface water drain to minimise the risk of run off entering the river. If concrete is to be sprayed, suitable protective sheeting must be provided to prevent rebounded or windblown concrete from entering the marine environment. Rebounded material must be cleared away before the sheeting is removed.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 13 para. 16 in force at 29.12.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/1396/schedule/13/paragraph/16",
    "retrieved_at": "2026-10-28T21:51:18.993466+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}