# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, Paragraph 3

Extent: E+W+S

Licensed activities are authorised in relation to the construction, maintenance and operation of—
(a) Work No. 4B – River Water Abstraction Option—
Works to the existing cooling water supply pipelines running from Work No. 1E to the existing intake structures within the River Trent, including, as necessary, a temporary cofferdam structure, new, upgraded or replacement pipelines, plant, buildings, enclosures, structures and cable;
(b) Work No. 5 – Water Discharge Corridor—
Works to discharge used cooling water and treated wastewater comprising works to the existing cooling water discharge pipeline(s) running from Work No. 1B to the existing outfall structures within the River Trent, including, as necessary, new, upgraded or replacement pipelines, plant, enclosures, outfall structure, screens and other structures, and cable; and
(c) any such work, further associated development listed in Schedule 1 ancillary to Work Nos. 4B and 5.

---
Source: https://www.legislation.gov.uk/uksi/2022/1396/schedule/13/paragraph/3 (the official version)
Page: https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-13/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.