{
  "url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-13/paragraph-8",
  "json_url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-13/paragraph-8.json",
  "legislation": "uksi/2022/1396",
  "legislation_title": "The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022",
  "legislation_url": "https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022",
  "path": "schedule/13/paragraph/8",
  "kind": "paragraph",
  "number": "8",
  "heading": "Notifications and Inspections",
  "text": "(1) The undertaker must ensure that—\n(a) a copy of this licence (issued as part of the grant of the Order) and any subsequent amendments or revisions to it is provided to—\n(i) all agents and contractors notified to the MMO in accordance with condition 12 and\n(ii) the masters responsible for the vessels notified to the MMO in accordance with condition 13.\n(2) Only those persons and vessels notified to the MMO in accordance with condition 12 and 13 are permitted to carry out the licensed activities.\n(3) Copies of this licence must also be available for inspection at the following locations—\n(a) the undertaker’s registered address;\n(b) any site office located at or adjacent to the construction site and used by the licence holder or its agents and contractors responsible for the loading, transportation or deposit of the authorised deposits; and\n(c) on board each vessel or at the office with responsibility for vessels from which authorised deposits or removals are to be made.\n(4) The documents referred to in sub-paragraph (1)(a) must be available for inspection by an enforcement officer at the locations set out in sub-paragraph (3)(b) above.\n(5) The undertaker must provide access, and if necessary appropriate transportation, to the offshore construction site or any other associated works or vessels to facilitate any inspection that the MMO considers necessary to inspect the works during construction and operation of the authorised development.\n(6) A notice to mariners must be issued at least 14 days prior to the commencement of the licensed activities or any part of them advising of the start date of those activities and the expected vessel routes from the construction ports to the relevant location. Copies of all notices must be provided to the MMO, TH, MCA and United Kingdom Hydrographic Office within 24 hours of issue.\n(7) The undertaker must notify the United Kingdom Hydrographic Office of the commencement (within ten days), progress and completion of construction (within ten days) of the licensed activities in order that all necessary amendments to nautical charts are made and the undertaker must send a copy of such notifications to the MMO within 24 hours of issue.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 13 para. 8 in force at 29.12.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/1396/schedule/13/paragraph/8",
    "retrieved_at": "2026-10-28T21:51:18.993466+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}