# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, Paragraph 19: Temporary haul road (traffic management and protection)

Extent: E+W+S

(1) The authorised development comprised in Work No. 10A shall be retained and maintained in accordance with the haul road plans.
(2) No part of the authorised development comprised in Work No. 10A shall be brought into use for the purposes of transporting abnormal loads until:
(a) appropriate traffic management measures have been put in place to allow vehicles to safely access the existing jetty comprised in Work No. 10B and cross Trent Side; and
(b) appropriate protection measures have been put in place to the Trent Side access points adjacent to the road crossing.
(3) The traffic management and protection measures in (2) shall be in place at times when loads are utilising the haul road, unless otherwise agreed with the relevant planning authority.

---
Source: https://www.legislation.gov.uk/uksi/2022/1396/schedule/2/paragraph/19 (the official version)
Page: https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-2/paragraph-19
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.