# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, Schedule 3: STREETS SUBJECT TO STREET WORKS

Extent: E+W+S

Table 1
(1)
Area
(2)
Streets subject to street works
(3)
Description of the street works
In the Borough of North Lincolnshire
A18
Widening and improvement works to two accesses on the A18 marked at reference points A and C on the access and rights of way plan and re-grading and re-surfacing of carriageway between the points marked E and F on sheet 1 on the access and rights of way plan
Chapel Lane
Works for installation and maintenance of Works No. 3B, 4A, 4B and 5 in those areas marked G, H, I, J, K, L and M on sheet 3 of the access and rights of way plans

---
Source: https://www.legislation.gov.uk/uksi/2022/1396/schedule/3 (the official version)
Page: https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.