# The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022, Schedule 8: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W+S

Table 5
(1)
Number of plots shown on the land plans
(2)
Purpose for which temporary possession may be take
(3)
Relevant part of the authorised development
47
Access and construction worksite
Work No. 2A
40b, 43, 56, 58, 59
Access and construction worksite.
Work No. 3B
32a
Access and construction worksite
Work No. 6
1, 2, 4, 5, 6, 7, 8, 9, 10, 26
Access and construction worksite.
Work No. 8A
40b, 55, 56, 58, 59, 67
Access and construction worksite.
Work No. 8C
1, 2, 3, 4, 10, 11, 12, 16a, 17, 17a, 18, 19, 20, 21, 22, 23, 25, 26, 27, 28, 29, 30, 32, 32a, 33, 34, 37, 38, 39, 49, 50a, 50, 51, 61, 62, 63, 72a
Access and construction worksite, use of the land for temporary laydown areas including any ancillary works necessary to facilitate the use of that land, storage, placing of temporary cranes and works associated with the re-instatement of the land. Works compound and welfare facilities, storage, laydown areas, and re-instatement of laydown areas.
Work Nos. 9A, 9B and 9C
13, 14, 16, 16a, 17a, 17b, 31, 32a, 46, 47, 48, 49a, 50, 50a, 51, 53, 54, 62, 63, 72, 72a, 73, 74, 78, 79, 93, 95, 101, 119, 131, 135, 136, 144, 145, 165, 165a 170
Access and construction worksite, including temporary haul road and any ancillary works necessary to facilitate the use of that land as a temporary haul road and re-instatement of the land.
Work No. 10A
136, 146, 149, 155
Access, inspection and repair, construction worksite and placing of temporary cranes.
Work No. 10B
68
Access and construction worksite.
Work No. 11A

---
Source: https://www.legislation.gov.uk/uksi/2022/1396/schedule/8 (the official version)
Page: https://openlegislation.uk/keadby-3-carbon-capture-equipped-gas-fired-generating-station-order-2022/schedule-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.