Paragraph 1 Interpretation
In this Schedule—
-
“AOD” means above ordnance datum;
-
“CEMP” means construction environmental management plan;
-
“commissioning” means the process during which plant components and systems forming part of the authorised development, having been constructed or modified, are made operational and are tested and verified to be in accordance with design assumptions and to have met the appropriate safety criteria;
-
“contaminated land” has the same meaning as that given in section 78A of the Environmental Protection Act 1990.