Article 9 Electoral areas in the Medway Towns
The district of the Medway Towns shall be divided into 34 wards, which shall comprise the areas and bear the names of the wards described in the Borough of Gillingham (Electoral Arrangements) Order 1976f1 and the Borough of Medway (Electoral Arrangements) Order 1976f2, and each ward shall be represented by two councillors.
Annotations
Footnotes
- f1
- f2