Extent: E+W

Any capitalised sum which is required to be paid under this Schedule shall be calculated by multiplying the cost of the maintenance or renewal works to the waterway necessitated as a result of the operation of the authorised development by the number of times that the maintenance or renewal works will be required during the operation of the authorised development.

---
Source: https://www.legislation.gov.uk/uksi/2015/680/schedule/8/paragraph/19 (the official version)