OpenLegislation

Paragraph 2 Emission data: water, leachate and gas control

Original text. Later amendments are not shown.

(1)

Samples of leachate or surface water (if present) must be collected at representative points.

(2)

Sampling and measuring of the volume and composition of any leachate must be performed separately at each point at which leachate is discharged from the site.

(3)

Monitoring of surface water (if present) shall take place at at least two points, one upstream from the landfill and one downstream.

(4)

Gas monitoring must be carried out for each section of the landfill and representative samples must be collected and analysed in accordance with Table 1.

(5)

A sample of leachate and water representative of the average composition, shall be taken for monitoring purposes in accordance with Table 1.

TABLE 1

Operational phaseAfter-care phase f1

Notes to Table 1

(1)

Longer intervals may be allowed if the evaluation of data indicates that they would be equally effective. For leachates, the conductivity must always be measured at least once a year.

(2)

These do not apply where leachate collection is not required under paragraph 2(1)(c) of Schedule 3.

(3)

The frequency of sampling may be adapted on the basis of the morphology of the landfill waste (in tumulus, buried, etc) (but only if SEPA considers that the conditions of the landfill permit should allow for it).

(4)

The parameters to be measured and substances to be analysed vary according to the composition of the waste deposited. They must be specified in the conditions of the landfill permit and reflect the leaching characteristics of the wastes.

(5)

On the basis of the characteristics of the landfill site, SEPA may determine that these measurements are not required.

(6)

These measurements are related mainly to the content of the organic material in the waste.

(7)

CH4, CO2, O2 regularly, other gases as required, according to the composition of the waste deposited, with a view to reflecting its leaching properties.

(8)

Efficiency of the gas extraction system must be checked regularly.

Leachate volume f2Monthly f3, Every six months
Leachate composition f4QuarterlyEvery six months
Volume and composition of surface water f5Quarterly Every six months
Potential gas emissions and atmospheric Pressuref6 (CH4, CO2, O2, H2S, H2 etc)Monthly , f7Every six months f8

Annotations

Footnotes

f1

(3)

The frequency of sampling may be adapted on the basis of the morphology of the landfill waste (in tumulus, buried, etc) (but only if SEPA considers that the conditions of the landfill permit should allow for it).

f2

(2)

These do not apply where leachate collection is not required under paragraph 2(1)(c) of Schedule 3.

f3

(1)

Longer intervals may be allowed if the evaluation of data indicates that they would be equally effective. For leachates, the conductivity must always be measured at least once a year.

f4

(4)

The parameters to be measured and substances to be analysed vary according to the composition of the waste deposited. They must be specified in the conditions of the landfill permit and reflect the leaching characteristics of the wastes.

f5

(5)

On the basis of the characteristics of the landfill site, SEPA may determine that these measurements are not required.

f6

(6)

These measurements are related mainly to the content of the organic material in the waste.

f7

(7)

CH4, CO2, O2 regularly, other gases as required, according to the composition of the waste deposited, with a view to reflecting its leaching properties.

f8

(8)

Efficiency of the gas extraction system must be checked regularly.