Paragraph 6 Topography of the site: data on the landfill body
The topography of the site and settling behaviour of the landfill body shall be monitored in accordance with Table 3.
TABLE 3
| Operating phase | After-care phase | |
|---|---|---|
| Note to Table 3 | ||
(1) Data for the status plan of the concerned landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill. | ||
| Structure and composition of landfill bodyf1 | Yearly | |
| Settling behaviour of the level of the landfill body | Yearly | Yearly reading |
Annotations
Footnotes
- f1
(1)
Data for the status plan of the concerned landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.