Paragraph 6 Topography of the site: data on the landfill body

Original text. Later amendments are not shown.

The topography of the site and settling behaviour of the landfill body shall be monitored in accordance with Table 3.

TABLE 3

Operating phaseAfter-care phase

Note to Table 3

(1)

Data for the status plan of the concerned landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.

Structure and composition of landfill bodyf1Yearly
Settling behaviour of the level of the landfill bodyYearlyYearly reading

Annotations

Footnotes

f1

(1)

Data for the status plan of the concerned landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.