# The Lerwick Harbour Revision Order 2007, Article 3: Power to construct works


Subject to the provisions of this Order, the Authority may in the Shetland Islands Area in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plans and the deposited sections construct, execute and maintain the following works together with incidental works and conveniences connected therewith:–
Work No. 1
A reclamation of an area of seabed being an area shown coloured blue on the deposited plan of Work No. 1 being an area enclosed by an imaginary line commencing at a Point A (1143177N, 446670E) where the new works meet the toe of the existing breakwater enclosing part of the Gremista Marina, and travelling a distance of 174 metres in a generally east north east direction to Point B (1143245N, 446830E), then 60 metres in a generally north north west direction to Point C (1143298N, 446802E), then 45 metres in a generally north north east direction to terminate at Point D (1143343N, 4468010E), where the new works meet the shoreline at Gremista.
The area will be infilled using non-selected dredged material consisting of sand, cobbles, boulders and blasted dredged rock with particle sizes varying from 0.1 millimetres to 500 millimetres. The south and east face of the reclamation between Points A, B, C and D will be protected using imported rock armour stones with a size of generally 1.0 tonne.
The top level of the completed works shall be +3.5 metres above Admiralty Chart Datum, (+2.3 metres above Ordnance Datum (Local)).
Work No. 2
A reclamation of an area of seabed being an area shown coloured blue on the deposited plan of Work No. 2 being an area enclosed by an imaginary line commencing at a Point E (1144569N, 447192E) where the new works meet the toe of the existing revetment at the north east corner of the Greenhead Base and travelling a distance of 43 metres in a generally north north east direction to Point F (1144607N, 447213E), then 298 metres in a generally north by east direction to Point G (1144899N, 447269E), then 78 metres in a generally west north west direction to terminate at Point H (1144935N, 447200E), where the new works meets the shoreline at Greenhead.
The area will be infilled using non-selected dredged material consisting of sand, cobbles, boulders and blasted dredged rock with particle sizes varying from 0.1 millimetres to 500 millimetres. All exposed faces of the reclamation from Point E to Point H shall be protected using imported rock armour stones with a size generally 2.0 – 4.0 tonnes.
The top level of the completed works shall be +4.0 metres above Admiralty Chart Datum, (+2.8 metres above Ordnance Datum (Local)).

---
Source: https://www.legislation.gov.uk/ssi/2007/284/article/3 (the official version)
Page: https://openlegislation.uk/lerwick-harbour-revision-order-2007/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.