# The Lerwick Harbour Revision Order 2010, Article 3: Power to construct works

Extent: S

The Authority may in the lines and situations and within the limits of deviation and according to the levels shown on the deposited plans, sections and elevations construct and maintain the following works—
Work No. 1 – The construction at Greenhead Base of a concrete suspended deck quay on steel bearing piles and rock armour revetment slope extending south from existing quay structures thence turning in an easterly direction and having an overall length of 185 metres followed by a rock armour revetment slope extending in an easterly direction for 16 metres then turning in a southerly direction for 71 metres before returning in a south westerly direction for 84 metres to meet the existing shore comprising a total area of 1.185 hectares; the location of which is shown on Sheets Nos. 1 and 2 and the sections and elevations are shown on Sheets Nos. 3 and 4;
Work No. 2 – The reclamation and infilling of seabed at Point of Scattland to be retained on the seaward limits by a rock armoured revetment slope extending from Work No. 1 in a southerly direction for 130 metres then turning in a south westerly direction for 160 metres to meet with the foreshore at the root of an existing quay of Gremista comprising a total area of 0.3750 hectares; the location of which is shown on Sheets Nos. 1 and 5 and the sections and elevations are shown on Sheet No. 6;
Work No. 3 – The construction at Mairs Yard of a steel sheet pile quay wall with concrete cope commencing at the root of the existing Holmsgarth jetty and extending in a north westerly direction for 151 metres before turning 90 degrees for 25 metres with stop end and reclamation with rock armour revetment slope extending from the quay wall in a south westerly direction for 122 metres to meet the existing foreshore, comprising a total area of 1.450 hectares; the location of which is shown on Sheets Nos. 1 and 7 and sections and elevations are shown on Sheet No. 8;
Work No. 4 – The construction of a sheet pile quay wall and jetty with concrete cope incorporating and extending the existing Holmsgarth Jetty commencing at the root of Holmsgarth Jetty and extending and continuing the existing Jetty line in a north easterly direction for 142 metres then turning in a northerly direction for 144 metres, then turning in an easterly direction for 20 metres, then turning in a southerly direction for 235 metres before returning in a south westerly direction for 129 metres to meet the existing quay structure comprising a total area of 1.310 hectares; the location of which is shown on Sheets Nos. 1 and 9 and sections and elevations are shown on Sheet Nos. 10 and 11.

---
Source: https://www.legislation.gov.uk/ssi/2010/471/article/3 (the official version)
Page: https://openlegislation.uk/lerwick-harbour-revision-order-2010/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

