# The Libya (United Nations Sanctions) (Channel Islands) Order 1993, Paragraph 3


Equipment not specially designed for use in crude oil export terminals but which because of their large capacity can be used for this purpose, as follows:
loading pumps with a capacity of 4000 cubic metres per hour or more and of small head (10 bars)
boosting pumps within the same range of flow rates
inline pipe line inspection tools and cleaning devices (ie pigging tools) of 16 inches to more in diameter
metering equipment with a capacity of 1000 cubic meters per hour or more.

---
Source: https://www.legislation.gov.uk/uksi/1993/2811/schedule/1/paragraph/3 (the official version)
Page: https://openlegislation.uk/libya-united-nations-sanctions-channel-islands-order-1993/schedule-1/paragraph-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

