# The Lifts Regulations 2016, Paragraph 2: Obligations of the installer


The installer shall operate an approved quality system for the design, manufacture, assembly, installation, final inspection and testing of the lifts as specified in point 3, and shall be subject to surveillance as specified in point 4. The adequacy of the technical design of the lifts shall have been examined in accordance with point 3.3.

---
Source: https://www.legislation.gov.uk/uksi/2016/1093/schedule/18/paragraph/2 (the official version)
Page: https://openlegislation.uk/lifts-regulations-2016/schedule-18/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

