# The Llangollen and Corwen Railway Order 2010, Article 4: Power to construct and maintain works

Extent: E+W

(1) The undertaker may construct and maintain the scheduled work.
(2) Subject to article 6 (power to deviate), the scheduled work may only be constructed in the lines or situations shown on the works plans and in accordance with the levels shown on the sections.

---