# The Local Authorities (Conduct of Referendums) (England) Regulations 2007, Rule 3: Timetable

Extent: E+W

The proceedings at the referendum shall be conducted in accordance with the following Timetable.
Timetable
Proceedings
Time
Publication of notice of referendum
Not later than the twenty-fifth day before the day of referendum.
Notice of poll
No later than the sixth day before the day of the referendum.
Polling
Between the hours of 7 in the morning and 10 at night on the day of referendum.

---
Source: https://www.legislation.gov.uk/uksi/2007/2089/schedule/5/rule/3 (the official version)
Page: https://openlegislation.uk/local-authorities-conduct-of-referendums-england-regulations-2007/schedule-5/rule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

