# The London Gateway Logistics and Commercial Centre Order 2007, Article 6: Power to deviate


(1) In constructing or maintaining any of the scheduled works, the Promoter may—
(a) deviate laterally from the lines or situations shown on the deposited plans within the limits of deviation relating to that work shown on those plans; and
(b) deviate vertically from the levels shown on the deposited sections—
(i) to any extent not exceeding 3 metres upwards; and
(ii) to any extent downwards.
(2) In constructing any work shown on the deposited plans as situated in a street and for which no limits of deviation are shown on those plans the Promoter may deviate laterally within the boundaries of that street.

---
Source: https://www.legislation.gov.uk/uksi/2007/2657/article/6 (the official version)
Page: https://openlegislation.uk/london-gateway-logistics-and-commercial-centre-order-2007/article-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

