# The London Gateway Logistics and Commercial Centre Order 2007, Paragraph 1


(1) For the protection of Network Rail the following provisions shall, unless otherwise agreed in writing between the Promoter and Network Rail, have effect—
(2) In this Schedule—
“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” shall be construed accordingly;
“the engineer” means an engineer to be appointed by Network Rail for the purpose in question;
“plans” includes sections, designs, drawings, specifications, soil reports, calculations and descriptions (including descriptions of methods of construction), staging proposals and programmes;
“Network Rail” means Network Rail Infrastructure Limited and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 736 of the Companies Act 1985) the holding Company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;
“railway property” means any railway belonging to Network Rail and any works, apparatus and equipment belonging to Network Rail connected therewith and includes any land held or used by Network Rail for the purposes of such railway or works, apparatus or equipment;
“relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction of the specified works or of any such act as is mentioned in paragraph 19;
“specified works” means so much of the authorised works as may be situated upon, across, under, over or within 15 metres of, or may in any way affect, railway property; and
“train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the Railways Act 1993.
(3) (a) The Promoter shall not under the powers conferred by this Order acquire or enter upon, take or use whether temporarily or permanently any railway property or acquire any new rights over any railway property unless such acquisition, entry or use is with the consent of Network Rail.
(b) Where Network Rail is asked to give its consent pursuant to sub-paragraph (a), such consent shall not be unreasonably withheld or delayed but may be given subject to reasonable conditions.

---
Source: https://www.legislation.gov.uk/uksi/2007/2657/schedule/2/paragraph/1 (the official version)
Page: https://openlegislation.uk/london-gateway-logistics-and-commercial-centre-order-2007/schedule-2/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

