# The London Gateway Port Harbour Empowerment Order 2008, Paragraph 11

Extent: E+W+S

The Harbour Authority shall—
(a) at all times afford reasonable facilities to the engineer for access to the specified works during their construction; and
(b) supply the engineer with all such information as he may reasonably require with regard to the specified works or the method of construction of the specified works.

---