# The London Luton Airport Expansion Development Consent Order 2025, Schedule 3: PERMANENT STOPPING UP OF PUBLIC RIGHTS OF WAY

Extent: E+W

(1)
Public rights of way to be stopped up
(2)
Extent of stopping up
Footpath 38 (FP38)
Between Point A on sheet 1 to Point B on sheet 2 of the Rights of Way Plans – Permanent Stopping Up of Public Rights of Way.
Footpath 29 (FP29)
Between Points B and C on sheet 2 of the Rights of Way Plans – Permanent Stopping Up of Public Rights of Way.
Bridleway 28 (BW28)
Between Points C and D on sheet 2 of the Rights of Way Plans – Permanent Stopping Up of Public Rights of Way.
Bridleway 37 (BW37)
Between Point D on sheet 2 to Point E on sheet 6 of the Rights of Way Plans – Permanent Stopping Up of Public Rights of Way.

---
Source: https://www.legislation.gov.uk/uksi/2025/463/schedule/3 (the official version)
Page: https://openlegislation.uk/london-luton-airport-expansion-development-consent-order-2025/schedule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

