Part 1 STREETS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
(1) Area | (2) Street affected | (3) Extent of stopping up | (4) New street to be substituted |
|---|---|---|---|
| London Borough of Barking and Dagenham | Footpath 47 | Footpath between FP4 and FP1 | Footpath provided by Work No. 6 between points FP1 via FP2 and FP3 and terminating at FP4 as shown on the traffic regulation plans |