# The London Underground (East London Line Extension) (No. 2) Order 2001, Article 11: Construction and maintenance of bridges

Extent: E+W+S

Notwithstanding any other provision of this Order or any enactment or rule of law the Company may in constructing and maintaining bridges authorised to be constructed under this Order—
(a) carry Work No. 5 over Surrey Canal Road by means of a bridge which shall not reduce the headway under that bridge to less than 5.30 metres measured between the surface of the road and the underside of that bridge; and
(b) carry Works Nos. 9, 10, 11 and 14 over Cold Blow Lane by means of bridges which shall not reduce the headway under those bridges to less than 3.65 metres measured between the surface of the lane and the underside of those bridges; and
(c) carry Work No. 5 over Hornshay Street by means of a bridge which shall not reduce the headway to less than 3.25 metres between the surface of that street and the underside of that bridge.

---
Source: https://www.legislation.gov.uk/uksi/2001/3682/article/11 (the official version)