{
  "url": "https://openlegislation.uk/london-underground-safety-measures-act-1991/schedule-1/crossheading-works-at-london-bridge",
  "json_url": "https://openlegislation.uk/london-underground-safety-measures-act-1991/schedule-1/crossheading-works-at-london-bridge.json",
  "legislation": "ukla/1991/18",
  "legislation_title": "London Underground (Safety Measures) Act 1991",
  "legislation_url": "https://openlegislation.uk/london-underground-safety-measures-act-1991",
  "path": "schedule/1/crossheading/works-at-london-bridge",
  "kind": "crossheading",
  "number": null,
  "heading": "Works at London Bridge",
  "text": "In Greater London—\nIn the London borough of Southwark—\nWork No. 1 A railway (507 metres in length) being a deviation of the existing southbound railway of the Northern Line, commencing by a junction with that railway beneath the river Thames at a point 153 metres north-east of the junction of London Bridge and Montagu Close and terminating by a junction with that railway beneath a point 82 metres north-east of the junction of Union Street and Borough High Street.\nWork No. 2 A new ticket hall and subway (135 metres in length), including an escalator subway, commencing beneath a point 24 metres south-west of the junction of Bedale Street and Borough High Street and terminating beneath a point 21 metres north of the junction of London Bridge Street and Borough High Street.\nWork No. 3 A subway (89 metres in length) commencing by a junction with an existing subway beneath a point 27 metres east of the junction of London Bridge Street and Borough High Street and terminating by a junction with the Northern Line southbound station tunnel beneath a point 83 metres north-east of the junction of those streets.\nWork No. 4 A subway (26 metres in length) commencing by a junction with Work No. 3 beneath a point 44 metres north-east of the junction of London Bridge Street and Borough High Street and terminating by a junction with the Northern line southbound station tunnel beneath a point 53 metres north-east of the junction of those streets.\nWork No. 5 A subway (26 metres in length) commencing by a junction with Work No. 2 at a point 23 metres south-west of the junction of St. Thomas Street and Borough High Street and terminating in the footway of Borough High Street at a point 32 metres south-west of the junction of those streets.\nWork No. 6 A subway (27 metres in length) commencing by a junction with Work No. 2 at a point 34 metres south-west of the junction of St. Thomas Street and Borough High Street and terminating in Southwark Street at a point 60 metres south-west of the junction of those streets.\nWork No. 7 A sewer (154 metres in length) being a diversion of part of the Battlebridge sewer commencing by a junction with that sewer beneath a point 27 metres north of the junction of London Bridge Street and Borough High Street and terminating by a junction with that sewer beneath a point 55 metres south-west of the junction of St. Thomas Street and Borough High Street.\nWork No. 8 A subway including a shaft (90 metres in length) commencing at a point 90 metres south-west of the junction of Southwark Street and Stoney Street and terminating by a junction with Work No. 1 beneath a point 25 metres south-east of the junction of those streets.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukla/1991/18/schedule/1/crossheading/works-at-london-bridge",
    "retrieved_at": "2026-10-29T14:46:51.583479+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}