# The London Underground (Victoria Station Upgrade) Order 2009, Article 17: Power to acquire land


(1) The Company may acquire compulsorily so much of the land shown on the land plans as lying within the permanent limits as may be required for or in connection with the authorised works and may use any land so acquired for those purposes or for any other purposes that are ancillary to its railway undertaking.
(2) This article is subject to articles 22 (power to acquire land limited to subsoil lying more than 4.5 metres beneath surface) and 24 (temporary use of land for construction of works).

---
Source: https://www.legislation.gov.uk/uksi/2009/2364/article/17 (the official version)
Page: https://openlegislation.uk/london-underground-victoria-station-upgrade-order-2009/article-17
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

