  "url": "https://openlegislation.uk/longfield-solar-farm-order-2023/schedule-13",
  "json_url": "https://openlegislation.uk/longfield-solar-farm-order-2023/schedule-13.json",
  "legislation": "uksi/2023/734",
  "legislation_title": "The Longfield Solar Farm Order 2023",
  "legislation_url": "https://openlegislation.uk/longfield-solar-farm-order-2023",
  "path": "schedule/13",
  "kind": "schedule",
  "number": "13",
  "heading": "DOCUMENTS AND PLANS TO BE CERTIFIED",
  "text": "Table 1\n(1)\nDocument name\n(2)\nDocument reference\n(3)\nRevision number\n(4)\nDate\nbiodiversity design strategy\n7.3.B\n1.0\nFebruary 2022\nbook of reference\n4.3(B)\n3.0\nJanuary 2023\nBulls Lodge substation extension drainage strategy\nAppendix 9D contained in the environmental statement (document reference 6.2)\n1.0\nNovember 2021\ndecommissioning strategy\n7.12(A)\n2.0\nAugust 2022\nenvironmental statement\nenvironmental statement volume 1: 6.1 (excluding chapters 2, ..., 7, 10, 14)\n>1.0\nFebruary 2022\nenvironmental statement volume 1: 6.1(A) (chapters 2, and 10)\n2.0\nAugust 2022\n. . .\n. . .\n. . .\nenvironmental statement volume 1: 6.1(B) (chapter 7)\n3.0\nSeptember 2022\nenvironmental statement volume 1: 6.1(A) (chapter 14)\n2.0\nNovember 2022\nenvironmental statement volume 2: 6.2 (excluding appendices 2A, 7A, 9A, 9D, 10F, 13B , 13C )\n1.0\nFebruary 2022\nenvironmental statement volume 2: 6.2(A) (appendix 2A)\n2.0\nDecember 2022\nenvironmental statement volume 2: 6.2(A) (appendix 7A)\n2.0\nSeptember 2022\nenvironmental statement volume 2: 6.2(A) (appendices 9A, 10F)\n2.0\nAugust 2022\nenvironmental statement volume 2: 6.2(B) (appendix 9D)\n1.0\nNovember 2021\nenvironmental statement volume 2: 6.2 (B) (appendix 13B)\n5.0\nJanuary 2023\nenvironmental statement volume 2: 6.2(A) (appendix 13C)\n2.0\nOctober 2022\nenvironmental statement volume 3: 6.3 (excluding figures ..., 2-5, 2-27, 2-32, 10-10-2, 10-12, 10-13 (visualisations 4 and 5 of 5) and 10-15)\n1.0\nFebruary 2022\nenvironmental statement volume 3: 6.3(A) (figure 2-3)\n2.0\nAugust 2022\n. . .\n2.0\nSeptember 2022\nenvironmental statement volume 3: 6.3(A) (figure 10-13 (visualisations 4 and 5 of 5))\n2.0\nOctober 2022\nenvironmental statement volume 3 6.3(C) (figure 10-15)\n4.0\nNovember 2022\nenvironmental statement volume 3: 6.3B (figure 2-5)\n3.0\nDecember 2022\n>environmental statement volume 3: 6.3B (figure 2-27)\n3.0\nDecember 2022\ncable route and substation ecology survey: 8.7\n1.0\nAugust 2022\nWheeler’s Hill and Cranham Road ecology survey: 8.8\n1.0\nAugust 2022\narboricultural impact assessment 8.13\n1.0\nOctober 2022\nPhase 1 ecology survey report 8.14\n1.0\nOctober 2022\nEcology appraisal for Boreham Road AIL Access 8.18\n1.0\nNovember 2022\nflood risk assessment\nAppendix 9A contained in the environmental statement (document reference 6.2(A))\n2.0\nAugust 2022\nframework construction traffic management plan\nAppendix 13B contained in the environmental statement (document reference 6.2 (B) )\n5.0\nJanuary 2023\nland plans\n2.1(A)\n2.0\nSeptember 2022\noutline battery safety management plan\n7.6\n1.0\nFebruary 2022\noutline construction environmental management plan\n7.10(C)\n4.0\nNovember 2022\noutline design principles\n7.3.A(D)\n5.0\nDecember 2022\noutline landscape and ecological management plan\n7.13 (D)\n6.0\nJanuary 2023\noutline operational environmental management plan\n7.11 (A)\n4.0\nNovember 2022\noutline public rights of way management plan\nAppendix 13C contained in the environmental statement (document reference 6.2(A))\n2.0\nOctober 2022\noutline soils resource management plan\n8.16\n1.0\nOctober 2022\noverarching written scheme of investigation\n8.11(A)\n2.0\nOctober 2022\npermissive paths plans\n7.14(A)\n2.0\nJanuary 2023\nstreets, access and rights of way plans\n2.3(A)\n2.0\nOctober 2022\nSuDS strategy\nAppendix 9C contained in the environmental statement (document reference 6.2)\n1.0\nFebruary 2022\ntraffic regulation measures plans\n2.4\n1.0\nFebruary 2022\nvegetation removal plan\nFigure 10-15 (document reference 6.3(C))\n4.0\nNovember 2022\nworks plans\n2.2(B)\n3.0\nOctober 2022",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 13 substituted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Word in Sch. 13 omitted (21.11.2023) by virtue of The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F3",
      "text": "Words in Sch. 13 omitted (21.11.2023) by virtue of The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F4",
      "text": "Word in Sch. 13 inserted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F5",
      "text": "Words in Sch. 13 inserted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "F",
      "label": "F6",
      "text": "Word in Sch. 13 substituted (21.11.2023) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch."
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 13 in force at 18.7.2023, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2023/734/schedule/13",
    "retrieved_at": "2026-10-28T21:43:22.591830+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}