# The Longfield Solar Farm Order 2023, Schedule 13: DOCUMENTS AND PLANS TO BE CERTIFIED

Extent: E+W+S

Table 1
(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
biodiversity design strategy
7.3.B
1.0
February 2022
book of reference
4.3(B)
3.0
January 2023
Bulls Lodge substation extension drainage strategy
Appendix 9D contained in the environmental statement (document reference 6.2)
1.0
November 2021
decommissioning strategy
7.12(A)
2.0
August 2022
environmental statement
environmental statement volume 1: 6.1 (excluding chapters 2, ..., 7, 10, 14)
>1.0
February 2022
environmental statement volume 1: 6.1(A) (chapters 2, and 10)
2.0
August 2022
. . .
. . .
. . .
environmental statement volume 1: 6.1(B) (chapter 7)
3.0
September 2022
environmental statement volume 1: 6.1(A) (chapter 14)
2.0
November 2022
environmental statement volume 2: 6.2 (excluding appendices 2A, 7A, 9A, 9D, 10F, 13B , 13C )
1.0
February 2022
environmental statement volume 2: 6.2(A) (appendix 2A)
2.0
December 2022
environmental statement volume 2: 6.2(A) (appendix 7A)
2.0
September 2022
environmental statement volume 2: 6.2(A) (appendices 9A, 10F)
2.0
August 2022
environmental statement volume 2: 6.2(B) (appendix 9D)
1.0
November 2021
environmental statement volume 2: 6.2 (B) (appendix 13B)
5.0
January 2023
environmental statement volume 2: 6.2(A) (appendix 13C)
2.0
October 2022
environmental statement volume 3: 6.3 (excluding figures ..., 2-5, 2-27, 2-32, 10-10-2, 10-12, 10-13 (visualisations 4 and 5 of 5) and 10-15)
1.0
February 2022
environmental statement volume 3: 6.3(A) (figure 2-3)
2.0
August 2022
. . .
2.0
September 2022
environmental statement volume 3: 6.3(A) (figure 10-13 (visualisations 4 and 5 of 5))
2.0
October 2022
environmental statement volume 3 6.3(C) (figure 10-15)
4.0
November 2022
environmental statement volume 3: 6.3B (figure 2-5)
3.0
December 2022
>environmental statement volume 3: 6.3B (figure 2-27)
3.0
December 2022
cable route and substation ecology survey: 8.7
1.0
August 2022
Wheeler’s Hill and Cranham Road ecology survey: 8.8
1.0
August 2022
arboricultural impact assessment 8.13
1.0
October 2022
Phase 1 ecology survey report 8.14
1.0
October 2022
Ecology appraisal for Boreham Road AIL Access 8.18
1.0
November 2022
flood risk assessment
Appendix 9A contained in the environmental statement (document reference 6.2(A))
2.0
August 2022
framework construction traffic management plan
Appendix 13B contained in the environmental statement (document reference 6.2 (B) )
5.0
January 2023
land plans
2.1(A)
2.0
September 2022
outline battery safety management plan
7.6
1.0
February 2022
outline construction environmental management plan
7.10(C)
4.0
November 2022
outline design principles
7.3.A(D)
5.0
December 2022
outline landscape and ecological management plan
7.13 (D)
6.0
January 2023
outline operational environmental management plan
7.11 (A)
4.0
November 2022
outline public rights of way management plan
Appendix 13C contained in the environmental statement (document reference 6.2(A))
2.0
October 2022
outline soils resource management plan
8.16
1.0
October 2022
overarching written scheme of investigation
8.11(A)
2.0
October 2022
permissive paths plans
7.14(A)
2.0
January 2023
streets, access and rights of way plans
2.3(A)
2.0
October 2022
SuDS strategy
Appendix 9C contained in the environmental statement (document reference 6.2)
1.0
February 2022
traffic regulation measures plans
2.4
1.0
February 2022
vegetation removal plan
Figure 10-15 (document reference 6.3(C))
4.0
November 2022
works plans
2.2(B)
3.0
October 2022

---
Source: https://www.legislation.gov.uk/uksi/2023/734/schedule/13 (the official version)
Page: https://openlegislation.uk/longfield-solar-farm-order-2023/schedule-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.