Article 2 Interpretation
In this Order—
-
“authorised works” means the scheduled works and any other works authorised by this Order;
-
“LWFL” means Lincs Wind Farm Limited whose registered office is at No. 1 Waterfront Avenue, Edinburgh EH5 1SG or any person to whom the powers conferred by this Order are transferred in an agreement pursuant to article 16;
-
“the deposited plans” means the plans certified by the Secretary of State as the deposited plans for the purposes of this Order;
-
“the deposited sections” means the sections certified by the Secretary of State as the sections for the purposes of this Order;
-
“the limits of deviation” means the limits of deviation for the scheduled works shown on the deposited plans;
-
“maintain” includes inspect, repair, adjust, alter, remove, reconstruct and replace, and “maintenance” shall be construed accordingly;
-
“scheduled works” means the works specified in the Schedule to this Order or any part of them; and
-
“Trinity House” means the Corporation of Trinity House of Deptford Strond.
All distances, directions and lengths stated in the description of the scheduled works are approximate, and distances between points on a scheduled work shall be taken to be measured along the scheduled work.
A reference to a co-ordinate in the description of the scheduled works is a reference to World Geodetic System 1984 datum.