# The M1 Junction 10a (Grade Separation) Order 2013, Article 15: Access to works

Extent: E+W+S

The undertaker may, for the purposes of the authorised development—
(a) form and lay out means of access, or improve existing means of access, in the locations and of the nature specified in Schedule 7 (access to works); and
(b) with the approval of the relevant planning authority after consultation with the highway authority (where the highway authority is not the undertaker), form and lay out such other means of access or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires.

---
Source: https://www.legislation.gov.uk/uksi/2013/2808/article/15 (the official version)
Page: https://openlegislation.uk/m1-junction-10a-grade-separation-order-2013/article-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

