# The M1 Junction 10a (Grade Separation) Order 2013, Schedule 10: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W+S

(1)
Location
(2)
Number of land shown on land plans, sheet 1
(3)
Purpose for which temporary possession may be taken
(4)
Relevant part of the authorised development
Luton Borough Council
1
To provide access to the area of the works to the north-east of Newlands Road and north-west of the M1 Spur form Newlands Road.
All works
1A
Construction of a boundary fence and diverted public right of way.
Work No.1, Work No.2, Work No.4A and Work No. 7
1B
Construction of a boundary fence.
Work No.1, Work No.2 and Work No.4A.
1D
Provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and works vehicles, storage of plant, material and topsoil and the treatment of site-generated waste.
All works
Luton Borough Council and Central Bedfordshire Council
2B
Carrying out works to trees, construction of fencing and planting of a hedgerow.
Work No.12
Luton Borough Council
2C
Construction and use of the vehicular access to the site compound, and construction of part of a turning head.
All works
2H
To provide access during the works and to allow the construction of new means of access.
Work No.1
2I
To allow the realignment of London Road and the associated works to the verges, footways and earthworks.
Work No.2 and Work No.6
2J
To allow the widening of A1081 Airport Way and the associated improvements to Capability Green junction.
Work No.1
Central Bedfordshire Council
3A
Storage of materials and works to infill existing burrow pit.
All works
3B
Construction of drainage pipes, access, the storage of materials and works to infill existing burrow pit.
Work No. 8
3C
Access to the area of the works to the south-east of the M1 Spur and to the north-east of Newlands Road, and the storage of materials and plant
All works
3D
Excavation of existing tip area and works to infill to original ground levels.
Work No. 9
3E
Use as a satellite compound for works to the south-east of the M1 Spur, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and works vehicles, storage of plant, material and topsoil and the treatment of site-generated waste.
All works
3F
Regrading of part of earth bunds that extend beyond the proposed highway boundary
Work No.1 and Work No.3A
4B
Carrying out works to trees, and construction of fencing
Work No.1 and Work No.3B
Luton Borough Council and Central Bedfordshire Council
5A
Carrying out works to trees, and construction of fencing
Work No.1 and Work No.3B
6C
To allow the widening of the M1 Spur, the provision of new slip roads as part of Kidney Wood junction and the provision of a continuous link between the M1 Spur and A1081 Airport Way.
Work No.1,
Work No.2,
Work No.3A, Work No.3B,
Work No.4A and Work No.4B
6D
To allow the widening of the M1 Spur, the provision of new slip roads as part of Kidney Wood junction and the provision of a continuous link between the M1 Spur and A1081 Airport Way.
Work No.1,
Work No.3A,
Work No.3B,
Work No.4A and
Work No.4B
6E
To allow the provision of new slip roads as part of Kidney Wood junction and the provision of a continuous link between the M1 Spur and A1081 Airport Way.
Work No.1,
Work No.2,
Work No.3B and
Work No.4B
7C
To allow the provision of new slip roads as part of Kidney Wood junction and the provision of a continuous link between the M1 Spur and A1081 Airport Way.
Work No.1,
Work No.2,
Work No.3A,
Work No.3B,
Work No.4A and
Work No.4B
7D
To allow the provision of a continuous link between the M1 Spur and A1081 Airport Way, the widening of A1081 Airport Way and the associated improvements to Capability Green junction.
Work No.1,
Work No.3B and
Work No.4B
7E
To allow the widening of A1081 Airport Way and the associated improvements to Capability Green junction.
Work No.1
7F
To allow the provision of the realigned A1081 London Road, the modification of A1081 London Road to form Old London Road (South) to provide access to Kidneywood House and Bull Wood Cottages, access to the works, the construction of the access to the proposed attenuation and infiltration ponds and the improvements to Newlands Road and its junction with A1081 London Road.
Work No.2,
Work No.5 and
Work No.10

---
Source: https://www.legislation.gov.uk/uksi/2013/2808/schedule/10 (the official version)
Page: https://openlegislation.uk/m1-junction-10a-grade-separation-order-2013/schedule-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.