This Instrument confirms a scheme “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022” to vary part of “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975” (as confirmed by “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975” (S.I. 1975/217).

The Secretary of State has modified the M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 as follows—

1

In paragraph 2(3) for “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2021” substitute “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022”.

2

In paragraph 4 for “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2021” substitute “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975 Further Plan”.

3

In paragraph 2(5) for “after “in an easterly then northerly direction” insert “to”, substitute “, for “a proposed roundabout on the Sheffield-Grimsby Trunk Road (A18) 1000 metres (1,094 yards) west of its junction with Scotter Road (marked D on the deposited plan)”.