Area
(2)
Length of Footpath/Cycle track/Footway
Ashford Borough
337 metres combined footway and cycle track from point A to point B on the rights of way and access plans.
Ashford Borough
90 metres combined footway and cycle track from point C to point D on the rights of way and access plans.
Ashford Borough
288 metres cycle track with a right of way on foot from point E to point F on the rights of way and access plans.
Ashford Borough
In the event of construction of the A2070 Option A only, 1298 metres combined footway and cycle track from point F to point G on the rights of way and access plans.
Ashford Borough
In the event of construction of the A2070 Option B only, 874 metres combined footway and cycle track from point F to point N on the rights of way and access plans.
Ashford Borough
In the event of construction of the A2070 Option B only, 537 metres combined footway and cycle track from point O to point G on the rights of way and access plans.
Ashford Borough
425 metres cycle track with a right of way on foot from point G to point H on the rights of way and access plans.
Ashford Borough
50 metres footpath from point I to point K on the rights of way and access plans.
Ashford Borough
291 metres cycle track with a right of way on foot from point J to point K on the rights of way and access plans.
Ashford Borough
210 metres combined footway and cycle track from point K to point L on the rights of way and access plans.
Ashford Borough
81 metres combined footway and cycle track from point M to point N on the rights of way and access plans.

---
Source: https://www.legislation.gov.uk/uksi/2017/1202/schedule/3/part/8 (the official version)
Page: https://openlegislation.uk/m20-junction-10a-development-consent-order-2017/schedule-3/part-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.