Schedule THE THE ROUTES OF THE SPECIAL ROADS
- (a)
Two routes to connect the eastbound carriageway of the motorway with the new roundabout to be constructed as part of the A249 (principal road) (these two routes being respectively given the reference numbers 1 and 2 on the deposited plan); and
- (b)
two routes to connect the westbound carriageway of the motorway with the new roundabout to be constructed as part of the A249 (principal road) (these two routes being respectively given the reference numbers 3 and 4 on the deposited plan).