  "url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-5",
  "json_url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-5.json",
  "legislation": "uksi/2022/549",
  "legislation_title": "The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
  "text": "(1)\nPlot Reference Number shown on Land Plans\n(2)\nPurpose for which rights over land may be acquired\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 1\n1/18a\nTo provide, construct, inspect, retain, access, maintain, renew and repair environmental mitigation works on land adjoining Stratford Brook.\nWork No.54\n1/40\nTo construct, retain, inspect, operate, access maintain and repair a diverted gas pipeline and associated equipment.\nWork No.63(a)\nLand Plans – Sheet 2\n2/8\nFor use as a construction access route.\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.34\n2/9, 2/10, 2/14\nFor use as a construction access route.\nFor use as a maintenance access for the authorised development.\nWork No.23(b)\nWork No.33(c)\nWork No.33(d)\nWork No.36\nWork No.52(c)\nWork No.63(a)\n2/12\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and a filter drain.\nWork No.63(a)\n2/12a\nTo construct, operate, access and maintain a carrier drain.\nWork No.52(b)\n2/13a\nTo construct, access and maintain a pre-earthworks ditch.\nWork No.33\n2/14a\nFor use as a construction access route.\nTo construct a footpath and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain a carrier drain.\nFor use as a maintenance access for the authorised development.\nWork No.33(c)\nWork No.52(b)\nWork No.63(a)\n2/14b\nFor use as a construction access route.\nTo construct a footpath and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain a carrier drain.\nFor use as a maintenance access for the authorised development.\nWork No.33(c)\nWork No.52(b)\nWork No.63(a)\n2/28a\nTo construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility.\nTo construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment.\nWork No.33(f)\nWork No.62(c)\n2/28c\nTo construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility.\nTo construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment.\nTo construct, operate, access, and maintain the diversion of telecommunication cables, media cables and equipment.\nWork No.33(f)\nWork No.62(c)\nWork No.65(c)\n2/36\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.63(a)\nLand Plans – Sheet 3\n3/3a\nTo construct and use as a maintenance access for the authorised development.\nWork No.1(a)\nWork No.1(c)\nWork No.64(a)\n3/3b\nTo construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.\nWork No.63(a)\n3/3d\nTo construct and use as a maintenance access in relation to a gantry and utility diversion.\nWork No.64(a)\nWork No.23(c)\n3/9\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(b)\n3/13\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(a)\n3/16\nTo construct a footpath and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.36\n3/19\nTo construct, inspect, access and maintain a retaining wall and associated planting.\nWork No.5(c)\n3/19a\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.\nWork No.55\n3/25\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.\nTo construct, operate, access and maintain an extension of an existing culvert.\nFor use as a maintenance access for the authorised development.\nWork No.1(e)\nWork No.35\nWork No.63(a)\n3/26a\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain an extension of an existing culvert.\nTo construct, operate, access and maintain a carrier drain.\nFor use as a maintenance access for the authorised development.\nWork No.1(e)\nWork No.35\nWork No.52(d)\nWork No.63(a)\n3/27\nTo construct, operate, access and maintain an extension of an existing culvert.\nWork No.1(e)\n3/31\nRight of access for the purposes of environmental compensation works.\nWork No.57\nWork No.58\n3/32\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.63(a)\n3/37\nTo construct, operate, access and maintain an extension of an existing culvert.\nTo construct, operate, access and maintain a carrier drain.\nTo undertake, retain, inspect, access, maintain, a highway fence.\nWork No.1(e)\nWork No.52(d)\nLand Plans – Sheet 4\n4/1\nRight of access for the purposes of environmental compensation works.\nWork No.57\nWork No.58\n4/3c\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.\nTo construct, inspect, access and maintain a retaining wall and highway fence.\nFor use as a maintenance access for the authorised development.\nWork No.1(a)\nWork No.1(c)\nWork No.35\nWork No.63(a)\n4/3d\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus.\nThe width of the new right within the plot not to exceed 6 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.62(d)\nWork No.63(a)\n4/4, 4/4a, 4/10\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.\nTo construct, inspect, access and maintain a retaining wall and highway fence.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.63(a)\n4/4b\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus, the width of the new right within the plot not to exceed 6 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.62(d)\nWork No.63(a)\n4/15a\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.\nWork No.55\n4/20\nTo construct a bridleway and use as a substitute private means of access, and maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.35(b)\nWork No.35(d)\n4/21\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(d)\n4/22b\nTo construct and use an access to environmental compensation works.\nWork No.58(d)\n4/23\nTo construct a bridleway and associated drainage and for use as a substitute private means of access, maintenance access, and for the maintenance of Cockcrow overbridge.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.35(b)\nWork No.35(d)\n4/30\nTo construct an access and associated drainage and for use as a substitute private means of access.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nWork No.35(c)\n4/31, 4/34\nTo construct a bridleway and use as a maintenance access.\nThe width of the new rights within the plot not to exceed 3 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\n4/37, 4/38\nTo construct, access and maintain a soakaway.\nWork No.52(f)\n4/41\nTo construct a bridleway and use as a maintenance access.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nTo construct, access and maintain a soakaway and pre-earthwork ditch.\nThe width of the new rights within the plot not to exceed 3 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.7\n4/43, 4/45a\nTo construct a bridleway and associated drainage, for use as a substitute private means of access, maintenance access and for the maintenance of Cockcrow overbridge.\nThe width of the new rights within the plot not to exceed 4.1 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.35(b)\n4/43a\nTo construct, access and maintain a soakaway.\nWork No.35\n4/43b\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new rights within the plot not to exceed 6 metres.\nTo construct, inspect, access and maintain a highway fence.\nWork No.63(a)\n4/43c\nTo construct a bridleway and use as a maintenance access.\nThe width of the new rights within the plot not to exceed 3 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\n4/43d\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.\nTo construct, inspect, access and maintain a highway fence.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.63(a)\n4/46\nTo construct, maintain and use an access to a drainage attenuation pond.\nWork No.52(e)\n4/47\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain a filter drain.\nThe width of the new rights within the plot not to exceed 6 metres.\nWork No.63(a)\n4/47a, 4/47b\nTo construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.63(a)\n4/47d\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and filter drain.\nWork No.63(a)\n4/48a, 4/49a\nTo construct an access and associated drainage and for use as a substitute private means of access.\nThe width of the new right within the plot not to exceed 3.5 metres.\nWork No.35(c)\n4/51\nTo construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.35(c)\n4/51a\nTo construct a bridleway and use as a maintenance access.\nThe width of the new right within the plot not to exceed 3 metres.\nFor use as a maintenance access for the authorised development.\nWork No.35\n4/52, 4/54, 4/67\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(c)\n4/61\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, operate, access and maintain a filter drain.\nThe width of the new right within the plot not to exceed 6 metres.\nWork No.63(a)\n4/63\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nThe width of the new right within the plot not to exceed 6 metres.\nWork No.63(a)\n4/72\nTo construct and use an access as a private means of access and maintenance access.\nTo construct, maintain and use an access to a drainage attenuation pond.\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nFor use as a construction access route in connection with environmental compensation works.\nFor use as a maintenance access for the authorised development.\nWork No.52(e)\nWork No.58(c)\n4/73, 4/75, 4/79a, 4/86a\nTo construct, maintain and use an access to a drainage attenuation pond.\nWork No.52(e)\n4/82\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nThe width of the new right within the plot not to exceed 6 metres.\nWork No.63(a)\nLand Plans – Sheet 5\n5/1c\nTo construct, access and maintain a soakaway.\nWork No.52(g)\n5/1d\nTo construct a bridleway.\nTo operate, access and maintain a pre-earthwork ditch, environmental barrier.\nWork No.35\nWork No.52(g)\nWork No.61(d)\n5/7\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing watercourse.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.53(e)\n5/7a\nTo construct a bridleway and use as a maintenance access.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.52(i)\nWork No.7\n5/7c\nTo construct, access and maintain a soakaway and pre-earthwork ditch.\nWork No.35\n5/7d, 5/7e\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a carrier drain.\nTo construct, operate, access and maintain a diversion to an existing watercourse.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.37\nWork No.52(i)\nWork No.53(e)\n5/8\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.37\n5/8a\nTo construct, operate, access and maintain a diversion to an existing watercourse.\nTo construct, access and maintain a soakaway.\nWork No.53(e)\n5/8b\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a diversion to an existing watercourse.\nTo construct, access and maintain a soakaway.\nWork No.53(e)\n5/12a, 5/12b\nTo construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nWork No.62(g)\nWork No.7\n5/12c\nTo construct, operate, inspect, access and maintain an environmental barrier and soakaway.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nWork No.61(a)\nWork No.7\n5/13a, 5/13c\nTo construct, operate, inspect, access and maintain an environmental barrier.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nWork No.61(a)\nWork No.7\n5/13b\nTo construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment.\nTo construct, operate, inspect, access and maintain an environmental barrier.\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nWork No.61(a)\nWork No.62(g)\nWork No.7\n5/21\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nTo construct, access and maintain a pre-earthwork ditch.\nTo construct, maintain and use an access to a drainage attenuation pond.\nWork No.7\nWork No.52(h)\n5/21a\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nTo construct, access and maintain a pre-earthwork ditch.\nWork No.7\n5/24, 5/24a\nTo access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.\nTo construct, access and maintain a pre-earthwork ditch.\nTo construct, operate, inspect, access and maintain an environmental barrier.\nWork No.7\nWork No.61(b)\n5/30\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.35\nLand Plans – Sheet 6\n6/1b, 6/3a\nTo construct, access and maintain a pre-earthwork ditch.\nWork No.35\n6/2\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, inspect, access and maintain an environmental barrier and filter drain.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.35(f)\nWork No.61(c)\n6/2b\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, inspect, access and maintain an environmental barrier and filter drain.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.61(c)\n6/4\nTo construct, operate, inspect, access and maintain an environmental barrier and filter drain.\nTo construct, operate, access and maintain the diversion of telecommunication cables, media cables and equipment\nWork No.61(c)\nWork No.65(a)\n6/4a, 6/4b\nTo construct, operate, inspect, access and maintain an environmental barrier and filter drain.\nWork No.61(c)\n6/9, 6/10\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, inspect, access and maintain a retaining wall and filter drain.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.39\n6/23a\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nWork No.63(c)\nLand Plans – Sheet 7\n7/9, 7/10\nTo construct, operate, access and maintain modifications to access to gas valve compound.\nWork No.17(c)\nWork No.40\n7/15, 7/15a, 7/16\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nWork No.63(c)\n7/17\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo undertake, access and maintain tree and shrub planting.\nWork No.63(a)\n7/23\nTo construct a bridleway and for use as a private means of access and for use as a maintenance access.\nTo construct, operate, access and maintain diversions to existing utility connections and associated apparatus and equipment.\nFor use as a construction access route.\nFor use as a maintenance access for the authorised development.\nWork No.35\nWork No.35(k)\nLand Plans – Sheet 8\n8/5b, 8/5c\nTo construct, access and maintain the authorised development.\nTo construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment.\nTo access and maintain utility apparatus and equipment.\nWork No.18\nWork No.18(b)\nWork No.40\nWork No.65(a)\n8/7\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nTo construct, inspect, access and maintain a highway fence.\nWork No.63(c)\n8/11\nTo access, inspect and maintain a retaining wall.\nWork. No.16\n8/12\nTo construct an access and use as a private means of access.\nTo construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment.\nTo access, inspect and maintain a retaining wall.\nWork No.46\nWork No.16\nWork No.62(o)\n8/12a\nTo access, inspect and maintain a retaining wall.\nWork. No.16\nLand Plans – Sheet 9\n9/3\nTo construct an access and use as a private means of access.\nTo access, inspect and maintain a retaining wall.\nWork No.46\nWork No.16\n9/13\nTo construct, operate, inspect, access and maintain a carrier drain.\nWork No.52(l)\nLand Plans – Sheet 11\n11/2\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.57(a)\n11/3\nTo undertake, access and maintain tree and shrub planting.\nWork No.29\n11/4\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation works.\nWork No 60\n11/6\nTo construct, a bridleway, and filter drain.\nWork No.49\n11/14\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nTo construct, operate, access and maintain a soakaway and environmental barrier.\nWork No.49\nWork No.61(b)\n11/14a\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n11/18, 11/18b\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nTo construct, inspect, access and maintain a retaining wall.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n11/19\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a soakaway, pre-earthwork ditch and environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n11/19a\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nTo construct, inspect, access and maintain a retaining wall.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n11/20\nTo construct, operate, access and maintain a soakaway.\nWork No.49\n11/21\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a pre-earthwork ditch.\nFor use as a maintenance access for the authorised development.\nWork No.49\n11/22, 11/22a\nTo construct, operate, access and maintain a soakaway and environmental barrier.\nWork No.49\nWork No.61(a)\n11/23, 11/24a\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a soakaway and an environmental barrier.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\n11/24\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain a soakaway and an environmental barrier.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\n11/25\nTo construct a bridleway and use as a maintenance access.\nThe width of the new right within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\n11/25a\nTo construct a bridleway and use as a maintenance access.\nWork No.49\n11/29\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(e)\nLand Plans – Sheet 12\n12/1c\nTo construct, operate, access and maintain an environmental barrier.\nWork No.49\n12/4\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new right within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/4a, 12/5a, 12/5c, 12/5d, 12/5e, 12/7, 12/12, 12/17\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/5b\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new right within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/6\nTo construct, operate, access and maintain an environmental barrier.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/11\nTo construct a bridleway and use as a maintenance access and for the maintenance of Clearmount overbridge.\nTo construct, operate, access and maintain an environmental barrier.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/18\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new right within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(a)\nWork No.52(m)\n12/23\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.52(m)\n12/25\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nTo undertake, access and maintain shrub planting.\nFor use as a maintenance access for the authorised development.\nTo construct, operate, access and maintain a diverted gas pipeline and associated equipment.\nWork No.49\nWork No.61(a)\nWork No.52(m)\nWork No.63(e)\n12/25b\nTo construct, operate, access and maintain an environmental barrier.\nTo undertake, access and maintain shrub planting.\nTo construct, operate, access and maintain a diverted gas pipeline and associated equipment.\nWork No.61(a)Work\nNo.63(e)\n12/25c\nTo construct, operate, access and maintain a soakaway and an environmental barrier.\nWork No.61(a)\n12/27\nTo construct a bridleway and use as a maintenance access.\nTo construct, inspect, access and maintain a retaining wall.\nFor use as a maintenance access for the authorised development.\nWork No.49\n12/28\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n12/30\nTo construct a bridleway and use as a maintenance access.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\n12/31\nTo construct a bridleway and use as a maintenance access.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\n12/34\nTo construct a bridleway and use as a maintenance access.\nTo construct, maintain and use an access to a drainage attenuation pond.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\nWork No.52(h)\n12/34a\nTo construct, maintain and use an access to a drainage attenuation pond.\nTo construct, operate, access and maintain an environmental barrier.\nTo construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.\nWork No.52(h)\nWork No.61(b)\nWork No.63(e)\n12/34b\nTo construct, maintain and use an access to a drainage attenuation pond.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nWork No.52(h)\nWork No.61(b)\n12/34c\nTo construct a bridleway and use as a maintenance access.\nTo construct, maintain and use an access to a drainage attenuation pond.\nTo construct, operate, access and maintain an environmental barrier.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nFor use as a maintenance access for the authorised development.\nWork No.49\nWork No.61(b)\nWork No.52(h)\nLand Plans – Sheet 13\n13/2, 13/2d\nTo construct, access and maintain a pre-earthworks ditch.\nWork No.26\nWork No.35(e)\n13/2e\nTo construct, access and maintain a pre-earthworks ditch and environmental barrier.\nWork No.26\nWork No.35(e)\nWork No.61(c)\n13/4c, 13/4d\nTo construct, access and maintain a pre-earthworks ditch and environmental barrier.\nWork No.28\nWork No.61(d)\n13/4e, 13/4f, 13/4g\nTo construct, access and maintain a pre-earthworks ditch.\nWork No.28\n13/9b\nTo construct, access and maintain a pre earthworks ditch and environmental barrier.\nWork No.26\nWork No.35(e)\nWork No.61(c)\n13/9c\nTo construct, access and maintain a filter drain and environmental barrier.\nWork No.26\nWork No.35(e)\nWork No.61(c)\n13/10, 13/11, 13/11a\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.37\nWork No.51(i)\n13/14, 13/15\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(d)\nLand Plans – Sheet 20\n20/2, 20/3, 20/4\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(f)\nLand Plans – Sheet 21\n21/1\nRight of access for the purposes of environmental compensation works.\nWork No.58(g)\n21/1a\nRight of access for the purposes of environmental compensation works.\nWork No.57\nWork No.58\n21/2\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(g)\nLand Plans – Sheet 23\n23/1\nTo construct a bridleway and use as a maintenance access.\nFor use as a maintenance access for the authorised development.\nWork No.34\nLand Plans – Sheet 25\n25/1\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.58(h)\nLand Plans – Sheet 26\n26/1\nTo undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.\nWork No.57(b)\n26/2\nRight of access for the purposes of environmental compensation works.\nThe width of the new rights within the plot not to exceed 3.5 metres.\nWork No.57(b)",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 5 inserted (19.1.2023) by The M25 Junction 10/A3 Wisley Interchange Development Consent (Correction) Order 2023 (S.I. 2023/46), arts. 1, 2(10)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 2.6.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/549/schedule/5",
    "retrieved_at": "2026-10-28T22:00:02.816532+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",