# The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Extent: E+W

(1)
Plot Reference Number shown on Land Plans
(2)
Purpose for which rights over land may be acquired
(3)
Relevant part of the authorised development
Land Plans – Sheet 1
1/18a
To provide, construct, inspect, retain, access, maintain, renew and repair environmental mitigation works on land adjoining Stratford Brook.
Work No.54
1/40
To construct, retain, inspect, operate, access maintain and repair a diverted gas pipeline and associated equipment.
Work No.63(a)
Land Plans – Sheet 2
2/8
For use as a construction access route.
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.34
2/9, 2/10, 2/14
For use as a construction access route.
For use as a maintenance access for the authorised development.
Work No.23(b)
Work No.33(c)
Work No.33(d)
Work No.36
Work No.52(c)
Work No.63(a)
2/12
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and a filter drain.
Work No.63(a)
2/12a
To construct, operate, access and maintain a carrier drain.
Work No.52(b)
2/13a
To construct, access and maintain a pre-earthworks ditch.
Work No.33
2/14a
For use as a construction access route.
To construct a footpath and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain a carrier drain.
For use as a maintenance access for the authorised development.
Work No.33(c)
Work No.52(b)
Work No.63(a)
2/14b
For use as a construction access route.
To construct a footpath and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain a carrier drain.
For use as a maintenance access for the authorised development.
Work No.33(c)
Work No.52(b)
Work No.63(a)
2/28a
To construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility.
To construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment.
Work No.33(f)
Work No.62(c)
2/28c
To construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility.
To construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment.
To construct, operate, access, and maintain the diversion of telecommunication cables, media cables and equipment.
Work No.33(f)
Work No.62(c)
Work No.65(c)
2/36
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.63(a)
Land Plans – Sheet 3
3/3a
To construct and use as a maintenance access for the authorised development.
Work No.1(a)
Work No.1(c)
Work No.64(a)
3/3b
To construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.
Work No.63(a)
3/3d
To construct and use as a maintenance access in relation to a gantry and utility diversion.
Work No.64(a)
Work No.23(c)
3/9
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(b)
3/13
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(a)
3/16
To construct a footpath and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.36
3/19
To construct, inspect, access and maintain a retaining wall and associated planting.
Work No.5(c)
3/19a
To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.
Work No.55
3/25
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.
To construct, operate, access and maintain an extension of an existing culvert.
For use as a maintenance access for the authorised development.
Work No.1(e)
Work No.35
Work No.63(a)
3/26a
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain an extension of an existing culvert.
To construct, operate, access and maintain a carrier drain.
For use as a maintenance access for the authorised development.
Work No.1(e)
Work No.35
Work No.52(d)
Work No.63(a)
3/27
To construct, operate, access and maintain an extension of an existing culvert.
Work No.1(e)
3/31
Right of access for the purposes of environmental compensation works.
Work No.57
Work No.58
3/32
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.63(a)
3/37
To construct, operate, access and maintain an extension of an existing culvert.
To construct, operate, access and maintain a carrier drain.
To undertake, retain, inspect, access, maintain, a highway fence.
Work No.1(e)
Work No.52(d)
Land Plans – Sheet 4
4/1
Right of access for the purposes of environmental compensation works.
Work No.57
Work No.58
4/3c
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.
To construct, inspect, access and maintain a retaining wall and highway fence.
For use as a maintenance access for the authorised development.
Work No.1(a)
Work No.1(c)
Work No.35
Work No.63(a)
4/3d
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus.
The width of the new right within the plot not to exceed 6 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.62(d)
Work No.63(a)
4/4, 4/4a, 4/10
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.
To construct, inspect, access and maintain a retaining wall and highway fence.
For use as a maintenance access for the authorised development.
Work No.35
Work No.63(a)
4/4b
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus, the width of the new right within the plot not to exceed 6 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.62(d)
Work No.63(a)
4/15a
To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.
Work No.55
4/20
To construct a bridleway and use as a substitute private means of access, and maintenance access.
For use as a maintenance access for the authorised development.
Work No.35
Work No.35(b)
Work No.35(d)
4/21
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(d)
4/22b
To construct and use an access to environmental compensation works.
Work No.58(d)
4/23
To construct a bridleway and associated drainage and for use as a substitute private means of access, maintenance access, and for the maintenance of Cockcrow overbridge.
For use as a maintenance access for the authorised development.
Work No.35
Work No.35(b)
Work No.35(d)
4/30
To construct an access and associated drainage and for use as a substitute private means of access.
The width of the new rights within the plot not to exceed 3.5 metres.
Work No.35(c)
4/31, 4/34
To construct a bridleway and use as a maintenance access.
The width of the new rights within the plot not to exceed 3 metres.
For use as a maintenance access for the authorised development.
Work No.35
4/37, 4/38
To construct, access and maintain a soakaway.
Work No.52(f)
4/41
To construct a bridleway and use as a maintenance access.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
To construct, access and maintain a soakaway and pre-earthwork ditch.
The width of the new rights within the plot not to exceed 3 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.7
4/43, 4/45a
To construct a bridleway and associated drainage, for use as a substitute private means of access, maintenance access and for the maintenance of Cockcrow overbridge.
The width of the new rights within the plot not to exceed 4.1 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.35(b)
4/43a
To construct, access and maintain a soakaway.
Work No.35
4/43b
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new rights within the plot not to exceed 6 metres.
To construct, inspect, access and maintain a highway fence.
Work No.63(a)
4/43c
To construct a bridleway and use as a maintenance access.
The width of the new rights within the plot not to exceed 3 metres.
For use as a maintenance access for the authorised development.
Work No.35
4/43d
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.
To construct, inspect, access and maintain a highway fence.
For use as a maintenance access for the authorised development.
Work No.35
Work No.63(a)
4/46
To construct, maintain and use an access to a drainage attenuation pond.
Work No.52(e)
4/47
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain a filter drain.
The width of the new rights within the plot not to exceed 6 metres.
Work No.63(a)
4/47a, 4/47b
To construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres.
For use as a maintenance access for the authorised development.
Work No.35
Work No.63(a)
4/47d
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and filter drain.
Work No.63(a)
4/48a, 4/49a
To construct an access and associated drainage and for use as a substitute private means of access.
The width of the new right within the plot not to exceed 3.5 metres.
Work No.35(c)
4/51
To construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access.
For use as a maintenance access for the authorised development.
Work No.35(c)
4/51a
To construct a bridleway and use as a maintenance access.
The width of the new right within the plot not to exceed 3 metres.
For use as a maintenance access for the authorised development.
Work No.35
4/52, 4/54, 4/67
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(c)
4/61
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, operate, access and maintain a filter drain.
The width of the new right within the plot not to exceed 6 metres.
Work No.63(a)
4/63
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
The width of the new right within the plot not to exceed 6 metres.
Work No.63(a)
4/72
To construct and use an access as a private means of access and maintenance access.
To construct, maintain and use an access to a drainage attenuation pond.
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
For use as a construction access route in connection with environmental compensation works.
For use as a maintenance access for the authorised development.
Work No.52(e)
Work No.58(c)
4/73, 4/75, 4/79a, 4/86a
To construct, maintain and use an access to a drainage attenuation pond.
Work No.52(e)
4/82
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
The width of the new right within the plot not to exceed 6 metres.
Work No.63(a)
Land Plans – Sheet 5
5/1c
To construct, access and maintain a soakaway.
Work No.52(g)
5/1d
To construct a bridleway.
To operate, access and maintain a pre-earthwork ditch, environmental barrier.
Work No.35
Work No.52(g)
Work No.61(d)
5/7
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing watercourse.
For use as a maintenance access for the authorised development.
Work No.35
Work No.53(e)
5/7a
To construct a bridleway and use as a maintenance access.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
For use as a maintenance access for the authorised development.
Work No.35
Work No.52(i)
Work No.7
5/7c
To construct, access and maintain a soakaway and pre-earthwork ditch.
Work No.35
5/7d, 5/7e
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a carrier drain.
To construct, operate, access and maintain a diversion to an existing watercourse.
For use as a maintenance access for the authorised development.
Work No.35
Work No.37
Work No.52(i)
Work No.53(e)
5/8
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.37
5/8a
To construct, operate, access and maintain a diversion to an existing watercourse.
To construct, access and maintain a soakaway.
Work No.53(e)
5/8b
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a diversion to an existing watercourse.
To construct, access and maintain a soakaway.
Work No.53(e)
5/12a, 5/12b
To construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
Work No.62(g)
Work No.7
5/12c
To construct, operate, inspect, access and maintain an environmental barrier and soakaway.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
Work No.61(a)
Work No.7
5/13a, 5/13c
To construct, operate, inspect, access and maintain an environmental barrier.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
Work No.61(a)
Work No.7
5/13b
To construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment.
To construct, operate, inspect, access and maintain an environmental barrier.
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
Work No.61(a)
Work No.62(g)
Work No.7
5/21
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
To construct, access and maintain a pre-earthwork ditch.
To construct, maintain and use an access to a drainage attenuation pond.
Work No.7
Work No.52(h)
5/21a
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
To construct, access and maintain a pre-earthwork ditch.
Work No.7
5/24, 5/24a
To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.
To construct, access and maintain a pre-earthwork ditch.
To construct, operate, inspect, access and maintain an environmental barrier.
Work No.7
Work No.61(b)
5/30
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.35
Land Plans – Sheet 6
6/1b, 6/3a
To construct, access and maintain a pre-earthwork ditch.
Work No.35
6/2
To construct a bridleway and use as a maintenance access.
To construct, operate, inspect, access and maintain an environmental barrier and filter drain.
For use as a maintenance access for the authorised development.
Work No.35
Work No.35(f)
Work No.61(c)
6/2b
To construct a bridleway and use as a maintenance access.
To construct, operate, inspect, access and maintain an environmental barrier and filter drain.
For use as a maintenance access for the authorised development.
Work No.35
Work No.61(c)
6/4
To construct, operate, inspect, access and maintain an environmental barrier and filter drain.
To construct, operate, access and maintain the diversion of telecommunication cables, media cables and equipment
Work No.61(c)
Work No.65(a)
6/4a, 6/4b
To construct, operate, inspect, access and maintain an environmental barrier and filter drain.
Work No.61(c)
6/9, 6/10
To construct a bridleway and use as a maintenance access.
To construct, operate, inspect, access and maintain a retaining wall and filter drain.
For use as a maintenance access for the authorised development.
Work No.35
Work No.39
6/23a
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
Work No.63(c)
Land Plans – Sheet 7
7/9, 7/10
To construct, operate, access and maintain modifications to access to gas valve compound.
Work No.17(c)
Work No.40
7/15, 7/15a, 7/16
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
Work No.63(c)
7/17
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To undertake, access and maintain tree and shrub planting.
Work No.63(a)
7/23
To construct a bridleway and for use as a private means of access and for use as a maintenance access.
To construct, operate, access and maintain diversions to existing utility connections and associated apparatus and equipment.
For use as a construction access route.
For use as a maintenance access for the authorised development.
Work No.35
Work No.35(k)
Land Plans – Sheet 8
8/5b, 8/5c
To construct, access and maintain the authorised development.
To construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment.
To access and maintain utility apparatus and equipment.
Work No.18
Work No.18(b)
Work No.40
Work No.65(a)
8/7
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
To construct, inspect, access and maintain a highway fence.
Work No.63(c)
8/11
To access, inspect and maintain a retaining wall.
Work. No.16
8/12
To construct an access and use as a private means of access.
To construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment.
To access, inspect and maintain a retaining wall.
Work No.46
Work No.16
Work No.62(o)
8/12a
To access, inspect and maintain a retaining wall.
Work. No.16
Land Plans – Sheet 9
9/3
To construct an access and use as a private means of access.
To access, inspect and maintain a retaining wall.
Work No.46
Work No.16
9/13
To construct, operate, inspect, access and maintain a carrier drain.
Work No.52(l)
Land Plans – Sheet 11
11/2
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.57(a)
11/3
To undertake, access and maintain tree and shrub planting.
Work No.29
11/4
To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation works.
Work No 60
11/6
To construct, a bridleway, and filter drain.
Work No.49
11/14
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
To construct, operate, access and maintain a soakaway and environmental barrier.
Work No.49
Work No.61(b)
11/14a
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
11/18, 11/18b
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
To construct, inspect, access and maintain a retaining wall.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
11/19
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a soakaway, pre-earthwork ditch and environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
11/19a
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
To construct, inspect, access and maintain a retaining wall.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
11/20
To construct, operate, access and maintain a soakaway.
Work No.49
11/21
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a pre-earthwork ditch.
For use as a maintenance access for the authorised development.
Work No.49
11/22, 11/22a
To construct, operate, access and maintain a soakaway and environmental barrier.
Work No.49
Work No.61(a)
11/23, 11/24a
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a soakaway and an environmental barrier.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
11/24
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain a soakaway and an environmental barrier.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
11/25
To construct a bridleway and use as a maintenance access.
The width of the new right within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
11/25a
To construct a bridleway and use as a maintenance access.
Work No.49
11/29
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(e)
Land Plans – Sheet 12
12/1c
To construct, operate, access and maintain an environmental barrier.
Work No.49
12/4
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
The width of the new right within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
Work No.52(m)
12/4a, 12/5a, 12/5c, 12/5d, 12/5e, 12/7, 12/12, 12/17
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
Work No.52(m)
12/5b
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
The width of the new right within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
Work No.52(m)
12/6
To construct, operate, access and maintain an environmental barrier.
Work No.49
Work No.61(a)
Work No.52(m)
12/11
To construct a bridleway and use as a maintenance access and for the maintenance of Clearmount overbridge.
To construct, operate, access and maintain an environmental barrier.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
Work No.52(m)
12/18
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
The width of the new right within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(a)
Work No.52(m)
12/23
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.49
Work No.52(m)
12/25
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
To undertake, access and maintain shrub planting.
For use as a maintenance access for the authorised development.
To construct, operate, access and maintain a diverted gas pipeline and associated equipment.
Work No.49
Work No.61(a)
Work No.52(m)
Work No.63(e)
12/25b
To construct, operate, access and maintain an environmental barrier.
To undertake, access and maintain shrub planting.
To construct, operate, access and maintain a diverted gas pipeline and associated equipment.
Work No.61(a)Work
No.63(e)
12/25c
To construct, operate, access and maintain a soakaway and an environmental barrier.
Work No.61(a)
12/27
To construct a bridleway and use as a maintenance access.
To construct, inspect, access and maintain a retaining wall.
For use as a maintenance access for the authorised development.
Work No.49
12/28
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
12/30
To construct a bridleway and use as a maintenance access.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
12/31
To construct a bridleway and use as a maintenance access.
To construct, operate, access and maintain an environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
12/34
To construct a bridleway and use as a maintenance access.
To construct, maintain and use an access to a drainage attenuation pond.
To construct, operate, access and maintain an environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
Work No.52(h)
12/34a
To construct, maintain and use an access to a drainage attenuation pond.
To construct, operate, access and maintain an environmental barrier.
To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.
Work No.52(h)
Work No.61(b)
Work No.63(e)
12/34b
To construct, maintain and use an access to a drainage attenuation pond.
To construct, operate, access and maintain an environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
Work No.52(h)
Work No.61(b)
12/34c
To construct a bridleway and use as a maintenance access.
To construct, maintain and use an access to a drainage attenuation pond.
To construct, operate, access and maintain an environmental barrier.
The width of the new rights within the plot not to exceed 3.5 metres.
For use as a maintenance access for the authorised development.
Work No.49
Work No.61(b)
Work No.52(h)
Land Plans – Sheet 13
13/2, 13/2d
To construct, access and maintain a pre-earthworks ditch.
Work No.26
Work No.35(e)
13/2e
To construct, access and maintain a pre-earthworks ditch and environmental barrier.
Work No.26
Work No.35(e)
Work No.61(c)
13/4c, 13/4d
To construct, access and maintain a pre-earthworks ditch and environmental barrier.
Work No.28
Work No.61(d)
13/4e, 13/4f, 13/4g
To construct, access and maintain a pre-earthworks ditch.
Work No.28
13/9b
To construct, access and maintain a pre earthworks ditch and environmental barrier.
Work No.26
Work No.35(e)
Work No.61(c)
13/9c
To construct, access and maintain a filter drain and environmental barrier.
Work No.26
Work No.35(e)
Work No.61(c)
13/10, 13/11, 13/11a
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.37
Work No.51(i)
13/14, 13/15
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(d)
Land Plans – Sheet 20
20/2, 20/3, 20/4
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(f)
Land Plans – Sheet 21
21/1
Right of access for the purposes of environmental compensation works.
Work No.58(g)
21/1a
Right of access for the purposes of environmental compensation works.
Work No.57
Work No.58
21/2
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(g)
Land Plans – Sheet 23
23/1
To construct a bridleway and use as a maintenance access.
For use as a maintenance access for the authorised development.
Work No.34
Land Plans – Sheet 25
25/1
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.58(h)
Land Plans – Sheet 26
26/1
To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.
Work No.57(b)
26/2
Right of access for the purposes of environmental compensation works.
The width of the new rights within the plot not to exceed 3.5 metres.
Work No.57(b)

---
Source: https://www.legislation.gov.uk/uksi/2022/549/schedule/5 (the official version)
Page: https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

