  "url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-7",
  "json_url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-7.json",
  "legislation": "uksi/2022/549",
  "legislation_title": "The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot Reference Number shown on Land Plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 1\n1/6\nThe main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials.\nAll works\n1/14\nRequired for works to tie in the B2039 Ockham Road North to the improved A3 Ockham Park junction.\nWork No.31(c),\nWork No.31(h)\n1/30, 1/31\nFor works relating to the improvement of Mill Lane at the tie-in with the A3 northbound on-slip and construction of a drainage attenuation pond.\nWork No.31(e),\nWork No.31(d),\nWork No.52(a)\nLand Plans – Sheet 2\n2/1\nFor the provision of a topsoil and materials storage and processing area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.\nAll Works\nWork No.34\n2/1a\nTo provide working space for the construction of a highway, a bridleway and a highway fence.\nWork No.33,\nWork No.63(a)\n2/1b\nTo provide working space for the construction of a highway, a bridleway and highway fence.\nWork No.33\n2/2, 2/4\nFor the provision of a topsoil and materials storage area, structures worksite, traffic management area and welfare facilities.\nAll Works\n2/3\nFor the provision of a topsoil and materials storage and a structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.\nAll Works\nWork No.34\n2/5a\nTo provide working space for the construction of a highway and bridleway.\nWork No.33\n2/5c\nFor the construction of a bridleway.\nWork No.34\n2/6\nFor the provision of a topsoil and materials storage area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.\nWork No.34\nAll Works\n2/11\nTo provide working space for a utility diversion.\nWork No.33,\nWork No.63(a)\n2/13\nFor the construction of a highway and utilities diversion.\nWork No.33,\nWork No.63(a)\n2/21, 2/21a\nFor the improvement and widening of the A3 northbound and to provide working space for the construction of a retaining wall and utility diversion.\nWork No.2,\nWork No.64(a)\n2/26\nTo provide working space and access for the realignment of Wisley Lane and diversion of a footpath.\nWork No.33(e),\nWork No.33(h)\n2/27a\nTo provide working space and access for the realignment of Wisley Lane.\nWork No.33(e)\n2/28\nTo provide working space and access and to allow the construction of a temporary road.\nWork No.33(e),\nWork No.33(f),\nWork No.33(g),\nWork No.65(c)\n2/28b\nTo provide working space and access during modifications to the entrance to RHS Garden Wisley and utility diversions.\nWork No.33(e),\nWork No.33(f),\nWork No.33(g),\nWork No.62(c),\nWork No.65(c)\n2/30\nTo provide working space and access and remediation of redundant carriageway.\nWork No.33(e)\n2/31, 2/32\nTo provide sufficient working space and access for the realignment of Wisley Lane and diversion of a footpath.\nWork No.33(e),\nWork No.33(h)\n2/33\nTo provide working space and access for diversion of a footpath.\nWork No.33(h)\nLand Plans – Sheet 3\n3/3, 3/3c\nTo provide working space to construct a bridleway and utility diversion.\nWork No.35,\nWork No.63(a)\n3/7\nTo provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.\nWork No.1(c),\nWork No.23(c),\nWork No.35,\nWork No.63(a),\nWork No.64(a)\n3/13a\nTo provide working space for utility diversion.\nWork No.63(a)\n3/19b\nTo provide working space for the improvement of A3 southbound, works to a watercourse and access for environmental mitigation and enhancement works.\nWork No.5(c),\nWork No.5(d),\nWork No.36,\nWork No.53(b),\nWork No.55\n3/24\nTo provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.\nWork No.1(c),\nWork No.23(c),\nWork No.35,\nWork No.63(a),\nWork No.64(a)\n3/33\nTo provide working space to construct a bridleway, a utility diversion, and for environmental mitigation works.\nWork No.35,\nWork No.63(a),\nWork No.56\n3/34\nTo provide working space to construct a bridleway, utility diversion and highway fence.\nWork No.35,\nWork No.63(a)\n3/37a\nTo provide working space to extend a culvert, construct a utility diversion and a highway fence.\nWork No.1(e),\nWork No.63(a)\nLand Plans – Sheet 4\n4/3, 4/3b\nTo provide working space to construct a bridleway, a utilities diversion and for environmental mitigation works.\nWork No.35,\nWork No.56,\nWork No.63(a)\n4/3a\nTo provide sufficient working space and access to construct a new maintenance access and bridleway, to divert a gas pipeline and associated equipment, to build a highway fence and to construct a filter drain.\nWork No.35,\nWork No.63(a)\n4/4c\nTo provide working space to construct a bridleway, a utility diversion, a highways fence and for the improvement and widening of the A3 northbound.\nWork No.1(c),\nWork No.35,\nWork No.63(a)\n4/15b\nTo provide working space for the alteration of the A3 southbound on-slip, improvement of junction of Old Lane, a utility diversion and construction of a highways fence.\nWork No.4,\nWork No.65(a)\n4/19\nTo provide working space for the construction of a bridleway, stopping up of existing accesses and improvement of junction of Old Lane.\nWork No.4,\nWork No.35(d)\n4/22\nTo provide working space to construct a bridleway and footpath.\nWork No.35,\nWork No.35(b),\nWork No.35(d)\n4/22a\nTo provide working space for the realignment of the access points to Ockham Common Car Park and to construct a bridleway and soakaway.\nWork No.35(d)\n4/24\nTo provide working space for the realignment of the access points to Ockham Bites Café and Ockham Common Car Park, the construction of a bridleway, the alteration and widening of the A3 southbound on-slip, the construction of an environmental barrier and highways fence and a utility diversion.\nWork No.4,\nWork No.35(d),\nWork No.65(a),\nWork No.61(d)\n4/25\nTo provide working space for the alteration and widening of the A3 southbound on-slip, improvement of junction of Old Lane and utility diversions\nWork No.4,\nWork No.62(f),\nWork No.65(a)\n4/27\nTo provide working space to construct a bridleway.\nWork No.35(d)\n4/30a\nTo provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utilities diversion.\nWork No.4, Work No.35(b), Work No.35, Work No.61(d), Work No.65(a)\n4/32, 4/33\nTo provide working space to construct a bridleway and footpath.\nWork No.35, Work No.35(b)\n4/35\nTo provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utility diversion.\nWork No.4,\nWork No.35,\nWork No.61(d),\nWork No.65(a)\n4/40, 4/40a\nTo provide working space to construct a bridleway, a utility diversion, and to construct an access to a drainage attenuation pond.\nWork No.35(b),\nWork No.35(c),\nWork No.63(a),\nWork No.52(e)\n4/42\nTo provide working space to construct a bridleway, a drainage attenuation pond and a soakaway.\nWork No.35,\nWork No.52(f)\n4/45, 4/45a\nTo provide working space for the widening of the A3 northbound, construction of a gantry, bridleway, utility diversions and a highways fence.\nWork No.1(c),\nWork No.23(d),\nWork No.35,\nWork No.62(e),\nWork No.63(a),\nWork No.64(b),\nWork No.65(d)\n4/46a, 4/46b\nTo provide working space to construct a bridleway and utility diversion.\nWork No.35,\nWork No.63(a)\n4/48, 4/49, 4/49b\nTo provide working space to construct a bridleway and realignment to a private means of access.\nWork No.35(c)\n4/48b\nTo provide working space to construct a bridleway, realignment to a private means of access and soakaway.\nWork No.35(c)\n4/52a\nFor use as a construction access route.\nAll Works\n4/57\nTo provide working space to construct a bridleway and utilities diversion.\nWork No.35(c),\nWork No.63(a)\n4/58\nTo provide working space and access to construct a bridleway, utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.\nWork No.1(c),\nWork No.35(c),\nWork No.63(a),\nWork No.61(a)\n4/62\nTo provide working space to construct utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.\nWork No.1(c),\nWork No.63(a),\nWork No.61(a)\n4/64, 4/65, 4/66, 4/66a\nTo provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.\nWork No.63(a),\nWork No.52(e)\n4/69\nFor the provision of a structures worksite.\nWork No.35(b)\n4/74, 4/76, 4/78, 4/78a, 4/79, 4/80\nTo provide working space to construct an access to a drainage attenuation pond.\nWork No.52(e)\n4/81, 4/81a\nTo provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.\nWork No.63(a),\nWork No.52(e)\n4/84\nTo provide working space to for the demolition of the Cockcrow overbridge, construction of a drainage attenuation pond, utilities diversions, environmental barrier and improvement of the A3 northbound carriageway.\nWork No.1(c),\nWork No.63(a),\nWork No.61(a),\nWork No.35(b),\nWork No.52(e),\nWork No.61(a)\n4/88\nFor the provision of a site compound and working space for the improvement of the A3 northbound off-slip and construction of a drainage attenuation pond.\nAll Works\nLand Plans – Sheet 5\n5/1\nFor the provision of topsoil storage and to provide working space for the construction of a free-flow slip lane, alteration and widening of the M25 westbound off-slip, a bridleway, utilities diversions and environmental barrier.\nWork No.11,\nWork No.28,\nWork No.35,\nWork No.62(f),\nWork No.61(d),\nWork No.65(a)\n5/2\nTo provide working space to construct a bridleway and a drainage attenuation pond and fencing.\nWork No.35,\nWork No.52(g)\n5/2a\nTo provide working space to construct a drainage attenuation pond and fencing.\nWork No.52(g)\n5/7b\nTo provide working space for the construction of a free-flow slip lane, for the alteration and widening of the M25 eastbound on-slip and the construction of a bridleway, environmental barrier and the diversion or realignment of a watercourse.\nWork No.10,\nWork No.26,\nWork No.35,\nWork No.53(f),\nWork No.61(c)\n5/9\nTo provide working space to construct a bridleway, a diversion or realignment of a watercourse and to construct a drainage attenuation pond and fencing.\nWork No.35, Work No.53(f), Work No.52(i)\n5/11\nFor use as a construction access route.\nAll Works\n5/12\nTo provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion, improvement of the M25 westbound on-slip and for the diversion and/or realignment of a watercourse.\nWork No.29,\nWork No.8,\nWork No.53(d),\nWork No.62(g),\nWork No.61(a)\n5/13\nTo provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion and improvement of A3 northbound off-slip.\nWork No.3,\nWork No.8,\nWork No.62(g),\nWork No.61(a)\n5/22, 5/23\nTo provide working space for the construction of a temporary slip road, free-flow slip lane, the improvement, realignment and widening of the M25 eastbound off-slip, the improvement, realignment and widening of the A3 northbound on-slip and the construction of an environmental barrier.\nWork No.9,\nWork No.14,\nWork No.25,\nWork No.61(b)\n5/31\nTo provide working space to construct a gantry.\nWork No.23(f)\nLand Plans – Sheet 6\n6/2a, 6/12, 6/12a,\nTo provide working space to construct a bridleway.\nWork No.35\n6/5, 6/5a\nFor use as a structures worksite.\nWork No.35(f)\n6/13, 6/13a, 6/13b, 6/14\nTo provide working space to construct a bridleway.\nWork No.39\n6/18\nTo provide working space for the improvement of the A3 southbound carriageway, works associated with stopping up an access to Painshill Park, to construct a retaining wall, a utility diversion and a highway fence.\nWork No.17(a),\nWork No.17(b),\nWork No.17(e),\nWork No.65(a)\n6/21a, 6/21b\nTo provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.\nWork No.17(a),\nWork No.17(b),\nWork No.23(h),\nWork No.65(a)\n6/22b\nTo provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.\nWork No.17(a),\nWork No.17(b),\nWork No.65(a)\nLand Plans – Sheet 7\n7/6\nFor the provision of a construction site compound.\nAll works\n7/12, 7/22\nFor the provision of topsoil and materials storage.\nAll works\n7/13, 7/13a, 7/14\nTo provide access and working space for a utility diversion.\nWork No.63(c)\n7/23a, 7/28\nTo provide working space for the improvement and widening of the A3 northbound off-slip, utility diversion and highway fence.\nWork No.16,\nWork No.62(k)\nLand Plans – Sheet 8\n8/7a, 8/7b\nTo provide working space to construct a footpath, utilities diversions and highways fence.\nWork No.41,\nWork No.62(l),\nWork No.63(c),\nWork No.65(a)\n8/27, 8/28, 8/29, 8/30\nTo provide working space to improve the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.\nWork No.42(a),\nWork No.42(b)\n8/34\nTo provide working space to improve the A3 southbound carriageway, the A3 Painshill junction and the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.\nWork No.17(a),\nWork No.42(a),\nWork No.42(b)\nLand Plans – Sheet 9\n9/4\nTo provide working space to construct improvements to the A245 Byfleet Road westbound and eastbound carriageways and B365 Seven Hills Road, a dedicated slip road, a utility diversion and a highway fence.\nWork No.44(a),\nWork No.44(e),\nWork No.44(f),\nWork No.45,\nWork No.47(a),\nWork No.62(p)\n9/4a\nTo provide working space to construct new private access to Feltonfleet School from B365 Seven Hills Road.\nWork No.45,\nWork No.46\n9/7\nTo provide working space to construct improvements and widening to the A245 Byfleet Road westbound and eastbound carriageways, a dedicated slip road, stopping up of an access, utilities diversions and a highway fence.\nWork No.44(a),\nWork No.44(b),\nWork No.44(c),\nWork No.44(d),\nWork No.44(e),\nWork No.44(f),\nWork No.47(a),\nWork No.47(b),\nWork No.62(p),\nWork No.62(o)\n9/8, 9/9, 9/10\nTo provide working space and construct improvements to the A245 Byfleet Road eastbound carriageway.\nWork No.47(a)\n9/12\nTo provide working space for the improvement and widening of the A245 Byfleet Road eastbound carriageway and for the construction of a footway, utilities diversions and a highway fence.\nWork No.47(a),\nWork No.47(b),\nWork No.47(e),\nWork No.62(q),\nWork No.64(k),\nWork No.65(h)\nLand Plans – Sheet 11\n11/1\nTo provide working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip and the construction of an environmental barrier.\nWork No.27(a),\nWork No.29,\nWork No.61(a)\n11/9, 11/9a\nFor the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.\nAll Works\n11/10, 11/10a, 11/11\nFor the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.\nAll Works\n11/26\nTo provide working space for the construction of a bridleway and drainage attenuation pond and fencing.\nWork No.49,\nWork No.52(m)\nLand Plans – Sheet 12\n12/1d\nTo provide working space for the construction of a bridleway and drainage attenuation pond and fencing.\nWork No.49,\nWork No.52(m)\n12/5\nTo provide working space for the construction of a bridleway and demolition and replacement of existing Clearmount overbridge.\nWork No.49\n12/25a\nTo provide working space for the construction of a bridleway tie-in to an existing permissive signposted route.\nWork No.49\n12/25d\nTo provide working space for the construction of a new gas main diversion under the M25.\nWork No.63(e)\nLand Plans – Sheet 13\n13/1\nTo provide working space to construct a bridleway, a diversion or realignment of a watercourse and drainage ditch.\nWork No.35(e),\nWork No.53(f)\n13/1a\nTo provide working space to construct a bridleway.\nWork No.35(e)\n13/9\nFor use as a construction compound.\nAll works.\nLand Plans – Sheet 20\n20/1a, 20/5\nFor modifications to road signage.\nWork No.33(i)\nLand Plans – Sheet 23\n23/2\nFor modifications to the entrance to Orchard Cottage.\nWork No.34\n23/3\nTo provide working space for the construction of a turning head on Elm Lane.\nWork No.34\n23/5, 23/6\nTo provide access to construction of Work No.34.\nWork No.34\n23/7\nFor modifications to the entrance to Orchard Cottage and to provide working space for the construction of a turning head on Elm Lane.\nTo provide access to construction of Work No.34.\nWork No.34\nLand Plans – Sheet 24\n24/1\nTo provide working space to tie-in Elm Lane to Elm Corner.\nWork No.50(a)\n24/2\nFor the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane.\nWork No.50(a)\n24/3\nFor the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane.\nTo provide working space to tie-in Elm Lane to Hatch Lane.\nWork No.50(a)\n24/4, 24/4a, 24/4b\nTo provide working space to tie-in Elm Lane to Old Lane and to install two toad underpasses and associated reptilian fencing along Old Lane. To provide working space to clear trees and other vegetation to create a visibility splay including road traffic mitigation measures\nWork No.50(a)\nWork No.50(b)\nLand Plans – Sheet 26\n26/2a\nTo provide working space for the construction of a footpath.\nWork No.51",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 7 inserted (19.1.2023) by The M25 Junction 10/A3 Wisley Interchange Development Consent (Correction) Order 2023 (S.I. 2023/46), arts. 1, 2(11)"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 in force at 2.6.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/549/schedule/7",
    "retrieved_at": "2026-10-28T22:00:02.816532+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}