# The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022, Schedule 7: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W

(1)
Plot Reference Number shown on Land Plans
(2)
Purpose for which temporary possession may be taken
(3)
Relevant part of the authorised development
Land Plans – Sheet 1
1/6
The main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials.
All works
1/14
Required for works to tie in the B2039 Ockham Road North to the improved A3 Ockham Park junction.
Work No.31(c),
Work No.31(h)
1/30, 1/31
For works relating to the improvement of Mill Lane at the tie-in with the A3 northbound on-slip and construction of a drainage attenuation pond.
Work No.31(e),
Work No.31(d),
Work No.52(a)
Land Plans – Sheet 2
2/1
For the provision of a topsoil and materials storage and processing area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.
All Works
Work No.34
2/1a
To provide working space for the construction of a highway, a bridleway and a highway fence.
Work No.33,
Work No.63(a)
2/1b
To provide working space for the construction of a highway, a bridleway and highway fence.
Work No.33
2/2, 2/4
For the provision of a topsoil and materials storage area, structures worksite, traffic management area and welfare facilities.
All Works
2/3
For the provision of a topsoil and materials storage and a structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.
All Works
Work No.34
2/5a
To provide working space for the construction of a highway and bridleway.
Work No.33
2/5c
For the construction of a bridleway.
Work No.34
2/6
For the provision of a topsoil and materials storage area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.
Work No.34
All Works
2/11
To provide working space for a utility diversion.
Work No.33,
Work No.63(a)
2/13
For the construction of a highway and utilities diversion.
Work No.33,
Work No.63(a)
2/21, 2/21a
For the improvement and widening of the A3 northbound and to provide working space for the construction of a retaining wall and utility diversion.
Work No.2,
Work No.64(a)
2/26
To provide working space and access for the realignment of Wisley Lane and diversion of a footpath.
Work No.33(e),
Work No.33(h)
2/27a
To provide working space and access for the realignment of Wisley Lane.
Work No.33(e)
2/28
To provide working space and access and to allow the construction of a temporary road.
Work No.33(e),
Work No.33(f),
Work No.33(g),
Work No.65(c)
2/28b
To provide working space and access during modifications to the entrance to RHS Garden Wisley and utility diversions.
Work No.33(e),
Work No.33(f),
Work No.33(g),
Work No.62(c),
Work No.65(c)
2/30
To provide working space and access and remediation of redundant carriageway.
Work No.33(e)
2/31, 2/32
To provide sufficient working space and access for the realignment of Wisley Lane and diversion of a footpath.
Work No.33(e),
Work No.33(h)
2/33
To provide working space and access for diversion of a footpath.
Work No.33(h)
Land Plans – Sheet 3
3/3, 3/3c
To provide working space to construct a bridleway and utility diversion.
Work No.35,
Work No.63(a)
3/7
To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.
Work No.1(c),
Work No.23(c),
Work No.35,
Work No.63(a),
Work No.64(a)
3/13a
To provide working space for utility diversion.
Work No.63(a)
3/19b
To provide working space for the improvement of A3 southbound, works to a watercourse and access for environmental mitigation and enhancement works.
Work No.5(c),
Work No.5(d),
Work No.36,
Work No.53(b),
Work No.55
3/24
To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.
Work No.1(c),
Work No.23(c),
Work No.35,
Work No.63(a),
Work No.64(a)
3/33
To provide working space to construct a bridleway, a utility diversion, and for environmental mitigation works.
Work No.35,
Work No.63(a),
Work No.56
3/34
To provide working space to construct a bridleway, utility diversion and highway fence.
Work No.35,
Work No.63(a)
3/37a
To provide working space to extend a culvert, construct a utility diversion and a highway fence.
Work No.1(e),
Work No.63(a)
Land Plans – Sheet 4
4/3, 4/3b
To provide working space to construct a bridleway, a utilities diversion and for environmental mitigation works.
Work No.35,
Work No.56,
Work No.63(a)
4/3a
To provide sufficient working space and access to construct a new maintenance access and bridleway, to divert a gas pipeline and associated equipment, to build a highway fence and to construct a filter drain.
Work No.35,
Work No.63(a)
4/4c
To provide working space to construct a bridleway, a utility diversion, a highways fence and for the improvement and widening of the A3 northbound.
Work No.1(c),
Work No.35,
Work No.63(a)
4/15b
To provide working space for the alteration of the A3 southbound on-slip, improvement of junction of Old Lane, a utility diversion and construction of a highways fence.
Work No.4,
Work No.65(a)
4/19
To provide working space for the construction of a bridleway, stopping up of existing accesses and improvement of junction of Old Lane.
Work No.4,
Work No.35(d)
4/22
To provide working space to construct a bridleway and footpath.
Work No.35,
Work No.35(b),
Work No.35(d)
4/22a
To provide working space for the realignment of the access points to Ockham Common Car Park and to construct a bridleway and soakaway.
Work No.35(d)
4/24
To provide working space for the realignment of the access points to Ockham Bites Café and Ockham Common Car Park, the construction of a bridleway, the alteration and widening of the A3 southbound on-slip, the construction of an environmental barrier and highways fence and a utility diversion.
Work No.4,
Work No.35(d),
Work No.65(a),
Work No.61(d)
4/25
To provide working space for the alteration and widening of the A3 southbound on-slip, improvement of junction of Old Lane and utility diversions
Work No.4,
Work No.62(f),
Work No.65(a)
4/27
To provide working space to construct a bridleway.
Work No.35(d)
4/30a
To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utilities diversion.
Work No.4, Work No.35(b), Work No.35, Work No.61(d), Work No.65(a)
4/32, 4/33
To provide working space to construct a bridleway and footpath.
Work No.35, Work No.35(b)
4/35
To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utility diversion.
Work No.4,
Work No.35,
Work No.61(d),
Work No.65(a)
4/40, 4/40a
To provide working space to construct a bridleway, a utility diversion, and to construct an access to a drainage attenuation pond.
Work No.35(b),
Work No.35(c),
Work No.63(a),
Work No.52(e)
4/42
To provide working space to construct a bridleway, a drainage attenuation pond and a soakaway.
Work No.35,
Work No.52(f)
4/45, 4/45a
To provide working space for the widening of the A3 northbound, construction of a gantry, bridleway, utility diversions and a highways fence.
Work No.1(c),
Work No.23(d),
Work No.35,
Work No.62(e),
Work No.63(a),
Work No.64(b),
Work No.65(d)
4/46a, 4/46b
To provide working space to construct a bridleway and utility diversion.
Work No.35,
Work No.63(a)
4/48, 4/49, 4/49b
To provide working space to construct a bridleway and realignment to a private means of access.
Work No.35(c)
4/48b
To provide working space to construct a bridleway, realignment to a private means of access and soakaway.
Work No.35(c)
4/52a
For use as a construction access route.
All Works
4/57
To provide working space to construct a bridleway and utilities diversion.
Work No.35(c),
Work No.63(a)
4/58
To provide working space and access to construct a bridleway, utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.
Work No.1(c),
Work No.35(c),
Work No.63(a),
Work No.61(a)
4/62
To provide working space to construct utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.
Work No.1(c),
Work No.63(a),
Work No.61(a)
4/64, 4/65, 4/66, 4/66a
To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.
Work No.63(a),
Work No.52(e)
4/69
For the provision of a structures worksite.
Work No.35(b)
4/74, 4/76, 4/78, 4/78a, 4/79, 4/80
To provide working space to construct an access to a drainage attenuation pond.
Work No.52(e)
4/81, 4/81a
To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.
Work No.63(a),
Work No.52(e)
4/84
To provide working space to for the demolition of the Cockcrow overbridge, construction of a drainage attenuation pond, utilities diversions, environmental barrier and improvement of the A3 northbound carriageway.
Work No.1(c),
Work No.63(a),
Work No.61(a),
Work No.35(b),
Work No.52(e),
Work No.61(a)
4/88
For the provision of a site compound and working space for the improvement of the A3 northbound off-slip and construction of a drainage attenuation pond.
All Works
Land Plans – Sheet 5
5/1
For the provision of topsoil storage and to provide working space for the construction of a free-flow slip lane, alteration and widening of the M25 westbound off-slip, a bridleway, utilities diversions and environmental barrier.
Work No.11,
Work No.28,
Work No.35,
Work No.62(f),
Work No.61(d),
Work No.65(a)
5/2
To provide working space to construct a bridleway and a drainage attenuation pond and fencing.
Work No.35,
Work No.52(g)
5/2a
To provide working space to construct a drainage attenuation pond and fencing.
Work No.52(g)
5/7b
To provide working space for the construction of a free-flow slip lane, for the alteration and widening of the M25 eastbound on-slip and the construction of a bridleway, environmental barrier and the diversion or realignment of a watercourse.
Work No.10,
Work No.26,
Work No.35,
Work No.53(f),
Work No.61(c)
5/9
To provide working space to construct a bridleway, a diversion or realignment of a watercourse and to construct a drainage attenuation pond and fencing.
Work No.35, Work No.53(f), Work No.52(i)
5/11
For use as a construction access route.
All Works
5/12
To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion, improvement of the M25 westbound on-slip and for the diversion and/or realignment of a watercourse.
Work No.29,
Work No.8,
Work No.53(d),
Work No.62(g),
Work No.61(a)
5/13
To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion and improvement of A3 northbound off-slip.
Work No.3,
Work No.8,
Work No.62(g),
Work No.61(a)
5/22, 5/23
To provide working space for the construction of a temporary slip road, free-flow slip lane, the improvement, realignment and widening of the M25 eastbound off-slip, the improvement, realignment and widening of the A3 northbound on-slip and the construction of an environmental barrier.
Work No.9,
Work No.14,
Work No.25,
Work No.61(b)
5/31
To provide working space to construct a gantry.
Work No.23(f)
Land Plans – Sheet 6
6/2a, 6/12, 6/12a,
To provide working space to construct a bridleway.
Work No.35
6/5, 6/5a
For use as a structures worksite.
Work No.35(f)
6/13, 6/13a, 6/13b, 6/14
To provide working space to construct a bridleway.
Work No.39
6/18
To provide working space for the improvement of the A3 southbound carriageway, works associated with stopping up an access to Painshill Park, to construct a retaining wall, a utility diversion and a highway fence.
Work No.17(a),
Work No.17(b),
Work No.17(e),
Work No.65(a)
6/21a, 6/21b
To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.
Work No.17(a),
Work No.17(b),
Work No.23(h),
Work No.65(a)
6/22b
To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.
Work No.17(a),
Work No.17(b),
Work No.65(a)
Land Plans – Sheet 7
7/6
For the provision of a construction site compound.
All works
7/12, 7/22
For the provision of topsoil and materials storage.
All works
7/13, 7/13a, 7/14
To provide access and working space for a utility diversion.
Work No.63(c)
7/23a, 7/28
To provide working space for the improvement and widening of the A3 northbound off-slip, utility diversion and highway fence.
Work No.16,
Work No.62(k)
Land Plans – Sheet 8
8/7a, 8/7b
To provide working space to construct a footpath, utilities diversions and highways fence.
Work No.41,
Work No.62(l),
Work No.63(c),
Work No.65(a)
8/27, 8/28, 8/29, 8/30
To provide working space to improve the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.
Work No.42(a),
Work No.42(b)
8/34
To provide working space to improve the A3 southbound carriageway, the A3 Painshill junction and the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.
Work No.17(a),
Work No.42(a),
Work No.42(b)
Land Plans – Sheet 9
9/4
To provide working space to construct improvements to the A245 Byfleet Road westbound and eastbound carriageways and B365 Seven Hills Road, a dedicated slip road, a utility diversion and a highway fence.
Work No.44(a),
Work No.44(e),
Work No.44(f),
Work No.45,
Work No.47(a),
Work No.62(p)
9/4a
To provide working space to construct new private access to Feltonfleet School from B365 Seven Hills Road.
Work No.45,
Work No.46
9/7
To provide working space to construct improvements and widening to the A245 Byfleet Road westbound and eastbound carriageways, a dedicated slip road, stopping up of an access, utilities diversions and a highway fence.
Work No.44(a),
Work No.44(b),
Work No.44(c),
Work No.44(d),
Work No.44(e),
Work No.44(f),
Work No.47(a),
Work No.47(b),
Work No.62(p),
Work No.62(o)
9/8, 9/9, 9/10
To provide working space and construct improvements to the A245 Byfleet Road eastbound carriageway.
Work No.47(a)
9/12
To provide working space for the improvement and widening of the A245 Byfleet Road eastbound carriageway and for the construction of a footway, utilities diversions and a highway fence.
Work No.47(a),
Work No.47(b),
Work No.47(e),
Work No.62(q),
Work No.64(k),
Work No.65(h)
Land Plans – Sheet 11
11/1
To provide working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip and the construction of an environmental barrier.
Work No.27(a),
Work No.29,
Work No.61(a)
11/9, 11/9a
For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.
All Works
11/10, 11/10a, 11/11
For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.
All Works
11/26
To provide working space for the construction of a bridleway and drainage attenuation pond and fencing.
Work No.49,
Work No.52(m)
Land Plans – Sheet 12
12/1d
To provide working space for the construction of a bridleway and drainage attenuation pond and fencing.
Work No.49,
Work No.52(m)
12/5
To provide working space for the construction of a bridleway and demolition and replacement of existing Clearmount overbridge.
Work No.49
12/25a
To provide working space for the construction of a bridleway tie-in to an existing permissive signposted route.
Work No.49
12/25d
To provide working space for the construction of a new gas main diversion under the M25.
Work No.63(e)
Land Plans – Sheet 13
13/1
To provide working space to construct a bridleway, a diversion or realignment of a watercourse and drainage ditch.
Work No.35(e),
Work No.53(f)
13/1a
To provide working space to construct a bridleway.
Work No.35(e)
13/9
For use as a construction compound.
All works.
Land Plans – Sheet 20
20/1a, 20/5
For modifications to road signage.
Work No.33(i)
Land Plans – Sheet 23
23/2
For modifications to the entrance to Orchard Cottage.
Work No.34
23/3
To provide working space for the construction of a turning head on Elm Lane.
Work No.34
23/5, 23/6
To provide access to construction of Work No.34.
Work No.34
23/7
For modifications to the entrance to Orchard Cottage and to provide working space for the construction of a turning head on Elm Lane.
To provide access to construction of Work No.34.
Work No.34
Land Plans – Sheet 24
24/1
To provide working space to tie-in Elm Lane to Elm Corner.
Work No.50(a)
24/2
For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane.
Work No.50(a)
24/3
For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane.
To provide working space to tie-in Elm Lane to Hatch Lane.
Work No.50(a)
24/4, 24/4a, 24/4b
To provide working space to tie-in Elm Lane to Old Lane and to install two toad underpasses and associated reptilian fencing along Old Lane. To provide working space to clear trees and other vegetation to create a visibility splay including road traffic mitigation measures
Work No.50(a)
Work No.50(b)
Land Plans – Sheet 26
26/2a
To provide working space for the construction of a footpath.
Work No.51

---
Source: https://www.legislation.gov.uk/uksi/2022/549/schedule/7 (the official version)
Page: https://openlegislation.uk/m25-junction-10a3-wisley-interchange-development-consent-order-2022/schedule-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.