  "heading": "Limits of deviation",
  "text": "(1) In carrying out the authorised development the undertaker may—\n(a) deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans;\n(b) subject to paragraphs (c) and (d), deviate vertically from the levels of the authorised development shown on the engineering drawings and sections up to a maximum of 1 metre upwards or downwards;\n(c) in respect of those parts of Work No. 6 situated between Duck Wood bridge and Grove bridge, deviate vertically from the levels of the authorised development shown on the engineering drawings and sections up to a maximum of 2 metres upwards or downwards;\n(d) in respect of Work No. 18 deviate vertically from the levels of the authorised development shown on the engineering drawings and sections up to a maximum of 1 metre upwards only,\nexcept that these maximum limits of vertical deviation do not apply where it is demonstrated by the undertaker to the Secretary of State’s satisfaction, and the Secretary of State, following consultation with the relevant planning authority, certifies accordingly that a deviation in excess of these limits would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.\n(2) Part 2 (procedure for discharge of requirements) of Schedule 2 (requirements) applies to an application to the Secretary of State for certification under paragraph (1) as though it were an approval required by a requirement under that Schedule.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Art. 7 in force at 6.6.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/573/article/7",
    "retrieved_at": "2026-10-28T21:59:46.182800+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}