# The M25 Junction 28 Development Consent Order 2022, Part 1: HIGHWAYS TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

Extent: E+W

(1)
Highway to be stopped up
(2)
Extent of stopping up
(3)
New highway to be provided
A12 Eastbound Off-Slip (including the non-segregated footway in the verge)
Between points 1/18 to 1/19 on sheet 1 of the streets, rights of way and access plans
Work No. 2
M25 Northbound On-Slip
Between points 1/14 on sheet 1 to 3/3 on sheet 3 of the streets, rights of way and access plans
Work No. 8
Non-segregated footway in the verge of the existing A12 Eastbound Carriageway
Between points 1/10 to 1/18 on sheet 1 of the streets, rights of way and access plans
Work No. 2

---
Source: https://www.legislation.gov.uk/uksi/2022/573/schedule/3/part/1 (the official version)