# The M25 Junction 28 Development Consent Order 2022, Part 5: TRAFFIC REGULATION MEASURES (CLEARWAYS)

Extent: E+W

(1)
Road name and number
(2)
Extent of Regulation
(3)
Measures
A12 Eastbound Off-Slip
From the start of A12 eastbound diverge, as shown by point 1/1 on sheet 1 of the speed limits and traffic regulations plans, eastbound for a distance of 773 metres, to the junction with the M25 Junction 28 circulatory carriageway, as shown by point 1/2 on sheet 1 of the speed limits and traffic regulations plans.
Clearway (to include verge and hard strips)
A12 Eastbound Carriageway
From the start of the A12 eastbound diverge, at the location illustrated by point 1/1 on sheet 1 of the speed limits and traffic regulations plans, eastbound for a distance of 918 metres along the mainline carriageway, to point 1/3 on sheet 1 of the speed limits and traffic regulations plans.
Clearway (to include verge and hard strips)

---
Source: https://www.legislation.gov.uk/uksi/2022/573/schedule/4/part/5 (the official version)
Page: https://openlegislation.uk/m25-junction-28-development-consent-order-2022/schedule-4/part-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

