# The M3 Junction 9 Development Consent Order 2024, Part 8: PUBLIC RIGHTS OF WAY TO BE CREATED

Extent: E+W

(1)
Area
(2)
Status and length of public right of way / footpath / cycle track / bridleway / footway and associated structures
Hampshire County Council (Winchester)
Cycle track between the Cart and Horses Junction (Kings Worthy) to the existing NCN Route 23 adjacent to Tesco and the proposed gyratory between points 16, 4 and 15 as shown on sheets 3, 5, 6 and 7 of the rights of way and access plans, comprising 2606 metres.
Hampshire County Council (Winchester)
Bridleway between the proposed gyratory and Easton Lane between point 3 and 4 as shown on sheets 6 and 7 of the rights of way and access plans, comprising 277 metres.
Hampshire County Council (Winchester)
Bridleway between Easton Lane and Long Walk between point 1 and 2 on sheets 4, 5, 6 and 7 of the rights of way and access plans, comprising 1197 metres.

---
Source: https://www.legislation.gov.uk/uksi/2024/752/schedule/3/part/8 (the official version)
Page: https://openlegislation.uk/m3-junction-9-development-consent-order-2024/schedule-3/part-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

