{
  "url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024/schedule-4/part-1",
  "json_url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024/schedule-4/part-1.json",
  "legislation": "uksi/2024/752",
  "legislation_title": "The M3 Junction 9 Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024",
  "path": "schedule/4/part/1",
  "kind": "part",
  "number": "1",
  "heading": "HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED",
  "text": "(1)\nArea\n(2)\nHighway to be stopped up\n(3)\nExtent of stopping up\n(4)\nNew Highway to be substituted/provided\nHampshire County Council (Winchester)\nA33 northbound carriageway\n936 metres between points 22 and 21 as shown on sheets 3 and 5 of the rights of way and access plans.\nA new cycle track between the Cart and Horses Junction (Kings Worthy) to the existing NCN Route 23 adjacent to Tesco and the proposed gyratory between points 16, 4, and 15 as shown on sheets 3, 5, 6, and 7 of the rights of way and access plans, comprising 2606 metres.\nHampshire County Council (Winchester)\nA34 northbound carriageway\n935 metres between points 17 and 18 as shown on sheets 5 and 7 of the rights of way and access plans.\nA new length of trunk road (realigned A34 northbound carriageway) for a length of 691 metres.\nHampshire County Council (Winchester)\nA34 southbound carriageway\n920 metres between points 19 and 20 as shown on sheets 5 and 7 of the rights of way and access plans.\nA new length of trunk road (realigned A34 southbound carriageway) for a length of 549 metres.\nHampshire County Council (Winchester)\nM3 northbound onslip carriageway\n258 metres between points 23 and 24 as shown on sheets 6 and 7 of the rights of way and access plans.\nA new length of trunk road (realigned A34 northbound merge) for a length of 617 metres.\nHampshire County Council (Winchester)\nM3 northbound offslip carriageway\n316 metres between points 29 and 30 as shown on sheets 7 and 8 of the rights of way and access plans.\nA new length of special road (realigned M3 northbound offslip carriageway) for a length of 440 metres.\nHampshire County Council (Winchester)\nM3 southbound onslip carriageway\n246 metres between points 27 and 28 as shown on sheet 7 of the rights of way and access plans.\nA new length of special road (realigned M3 southbound onslip carriageway) for a length of 687 metres.\nHampshire County Council (Winchester)\nM3 southbound offslip carriageway\n418 metres between the M3 southbound offslip to point 26 as shown on sheets 6 and 7 of the rights of way and access plans.\nA new length of special road (realigned M3 southbound offslip carriageway) for a length of 634 metres.\nHampshire County Council (Winchester)\nA272 northbound carriageway\n101 metres between points 33 and 34 as shown on sheet 7 of the rights of way and access plans.\nA new length of classified road (realigned A272 northbound carriageway) for a length of 116 metres.\nHampshire County Council (Winchester)\nEaston Lane southbound carriageway\n106 metres between points 31 and 32 as shown on sheet 7 of the rights of way and access plans.\nA new length of classified road (realigned Easton Lane southbound carriageway) for a length of 106 metres.\nHampshire County Council (Winchester)\nM3 Junction 9 gyratory (with demolition of existing structures over M3 northbound and southbound carriageways)\n640 metres as identified by all points referenced 35 on sheet 7 of the rights of way and access plans.\nA new length of trunk road (realigned M3 Junction 9 gyratory) for a length of 583 metres.\nHampshire County Council (Winchester)\nNational Highways rear entrance / exit\nAs noted on the rights of way and access plans.\nA realigned entrance / exit via a proposed roundabout (National Highways depot roundabout) for a length of 93 metres.\nHampshire County Council (Winchester)\nExisting public right of way to be stopped up\n441 metres of existing public right of way between points 6 and 7 as shown on sheets 6 and 7 of the rights of way and access plans.\nNew public right of way as per reference F/C 1 between points 4, 15 and 16, for a length of 2693 metres, as shown on sheets 3, 5, 6 and 7.\nHampshire County Council (Winchester)\nExisting public right of way to be stopped up\n290 metres of existing public right of way between points 5 and 6 as shown on sheets 6 and 7 of the rights of way and access plans.\nNew public right of way as identified between points 1 and 2, 3 and 4, for a length of 1679 metres as shown on sheets 4, 6 and 7 of the rights of way and access plans.\nHampshire County Council (Winchester)\nExisting footway / footpath between to be stopped up\n1719 metres of existing footway / footpath between points 7 and 8, 9 and 10, 11 and 12, 13 and 14 as shown on sheets 3, 5, 6 and 7 of the rights of way and access plans.\nNew public right of way as per reference F/C 1 between points 4, 15 and 16, for a length of 2693 metres as shown on sheets 3, 5, 6 and 7 of the rights of way and access plans.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 4 Pt. 1 in force at 9.10.2024, see art. 1 (as amended by S.I. 2024/1020, Sch.)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/752/schedule/4/part/1",
    "retrieved_at": "2026-10-28T21:28:19.007653+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}