  "url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024/schedule-7",
  "json_url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024/schedule-7.json",
  "legislation": "uksi/2024/752",
  "legislation_title": "The M3 Junction 9 Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/m3-junction-9-development-consent-order-2024",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot Reference Number shown on land plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 4\n4/1a\nLand required temporarily for temporary traffic management purposes.\nAncillary works\n4/1b\nRequired to facilitate and provide a working space and temporary access for works associated with the diversion of power cables.\nWork No. 35\n4/1c\nRequired to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane.\nWork No. 9\n4/1d\nLand required temporarily for temporary traffic management purposes.\nAncillary works\n4/2a\nRequired to facilitate and provide a working space and temporary access for works associated with the diversion of 50 metres in length of power cables.\nWork No. 35\n4/2b\nRequired to facilitate and provide a working space and temporary access for works associated with the diversion of power cables.\nWork No. 35\n4/2c\nLand required temporarily for temporary traffic management purposes.\nAncillary works\nLand Plans – Sheet 5\n5/5a\nRequirement to facilitate and provide a working space and temporary access for works associated with the construction of a drainage outfall into the River Itchen.\nWork No. 43\n5/2d\nLand required temporarily for temporary traffic management purposes.\nAncillary Works\n5/2e\nRequired to facilitate and provide a working space and temporary access for works associated with:\n1. the improvement and construction of the realignment of the northbound and southbound carriageways of the A33 between B3047 (London Road) / A33 junction and proposed A33 / M3 northbound onslip roundabout;\n1(g). the construction of the extension of the existing central reserve with associated vehicle restraint system;\n1(h). the construction of carriageway realignment on the existing River Itchen bridge (including possible remediation works);\n3. the construction improvements and realignment of the southbound carriageway of the A34;\n42. the construction of a drainage outfall into the River Itchen.\nWork No. 1, 1(g), 1(h), 3, 42\n5/3c\nRequired temporarily to facilitate construction generally and to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane.\nWork No. 9\n5/4\nRequired temporarily to facilitate construction of surface water drainage outfall.\nWork No. 42\nLand Plans – Sheet 6\n6/1f\nRequired to facilitate and provide a working space and temporary access for works associated with:\n9. the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane;\n9(a). the construction of an attenuation basin maintenance track;\n20. the diversion of a low-pressure gas main pipeline;\n26. the diversion of telecommunication equipment;\n33. the realignment of the National Cycle Route 23 and associated earthworks and landscaping.\nWork No. 9, 9(a), 20, 26, 33\n6/1g\nRequired to construct a temporary construction site compound.\nWork No. 38\n6/4d\nRequired to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane.\nWork No. 9\n6/6a\nRequired to facilitate and provide a working space and temporary access for works associated with the diversion of a low-pressure gas main pipeline.\nWork No. 20\n6/6b\nRequired to facilitate and provide a working space and temporary access for works associated with:\n20. the diversion of a low-pressure gas main pipeline;\n38: the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory.\nWork Nos. 20, 38\nLand Plans – Sheet 7\n7/1a\nRequired to facilitate and provide a working space and temporary access for works associated with the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory.\nWork No. 38\n7/2c\nLand required temporarily for temporary traffic management purposes.\nAncillary works\n7/4g\nLand required temporarily for temporary traffic management purposes.\nAncillary works\n7/5\nLand required temporarily for temporary traffic management purposes.\nAncillary works\n7/6\nLand required temporarily for temporary traffic management purposes\nAncillary works",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 in force at 9.10.2024, see art. 1 (as amended by S.I. 2024/1020, Sch.)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/752/schedule/7",
    "retrieved_at": "2026-10-28T21:28:19.007653+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}