# The M4 Motorway (Prince of Wales Bridge) (Temporary Restriction and Prohibition of Traffic) Order 2024, Article 2: Interpretation


In this Order—
“contraflow” means a part of a carriageway of a road where traffic is authorised to proceed in the opposite direction to the usual direction of traffic on that part;
“fifth length of carriageway” means—
(a) the eastbound carriageway of the M4 motorway from a point 3340 metres east of the eastern edge of Station Road overbridge to a point 192 metres west of the centre line of junction 22 of the M4 motorway; and
(b) the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction;
“first length of carriageway” means the eastbound carriageway of the M4 motorway from a point 1000 metres east of the eastern edge of Station Road overbridge to a point 2000 metres east of Station Road overbridge;
“first works period” means each period of 9 hours starting at 21:00 hours on each day during the works period;
“fourth length of carriageway” means the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction;
“hard shoulder” means the hard shoulder within the meaning of regulation 3(1)(e) of the Motorway Regulations, which is adjacent to the fifth length of carriageway;
“Motorway Regulations” means the Motorways Traffic (England and Wales) Regulations 1982;
“outside lane” means the right hand or off side lane of a carriageway with 2 or more lanes;
“overall width” has the meaning given in regulation 3(2) of the Road Vehicles (Construction and Use) Regulations 1986;
“second length of carriageway” means—
(a) the eastbound carriageway of the M4 motorway from a point 2000 metres east of the eastern edge of Station Road overbridge to a point 192 metres west of the centre line of junction 22 of the M4 motorway; and
(b) the westbound carriageway of the M4 motorway from a point 192 metres west of the centre line of junction 22 of the M4 motorway to a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction;
“second works period” means each period of 10 hours starting at 20:00 hours on each day during the works period;
“third length of carriageway” means the eastbound carriageway of the M4 motorway from a point 740 metres east of the centre line of the bridge over the rail line to Severn Tunnel Junction to a point 192 metres west of the centre line of junction 22 of the M4 motorway;
“works” means bridge deck repairs and associated maintenance;
“works period” means the period starting at 01:00 hours on Monday 1st July 2024 and ending when the works have been completed or after 18 months, whichever is sooner.

---
Source: https://www.legislation.gov.uk/uksi/2024/759/article/2 (the official version)