  "url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020/schedule-10",
  "json_url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020/schedule-10.json",
  "legislation": "uksi/2020/528",
  "legislation_title": "The M42 Junction 6 Development Consent Order 2020",
  "legislation_url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020",
  "path": "schedule/10",
  "kind": "schedule",
  "number": "10",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot reference Number shown on Land Plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 2\n2/3z, 2/58a, 2/58b, 2/59\nRequired for provision of a temporary construction compound.\nWorks Nos. 3 ,6 and 70\n2/52\nTemporary possession associated with the Solihull Road Overbridge and temporary alignments to ensure Solihull road remains open.\nWork Nos. 3 and 70\n2/2a\nRequired for the provision of temporary access to facilitate the construction works\nWork Nos. 1 and 5\n2/2c\nRequired for construction of a diversion to an existing local high pressure gas main; and to provide temporary access to land associated with the provision of environmental mitigation.\nWork No. 55\n2/3a\nRequired for construction of a new M42 off slip road and the demolition of an existing sheet pile wall.\nWork No. 4\n2/3c\nRequired for storage of earthworks and for the construction of a diversion to an existing local high pressure gas main.\nWorks Nos. 3 and 55\n2/3d\nRequired for construction of a new M42 off slip road and the demolition of an existing sheet pile wall and to provide temporary access to land associated with environmental mitigation.\nWork No. 4\n2/3g, 2/3h, 2/3i, 2/3j, 2/3p, 2/3r, 2/22\nRequired to provide temporary access to land associated with the provision of environmental mitigation.\nWork Nos. 3, 4 and 5\n2/3o, 2/10c, 2/29, 2/30\nRequired for construction of diversions to existing utilities apparatus and equipment.\nWork No. 3\n2/3u, 2/3ah\nRequired for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for construction of a reinforced cover slab for an existing fuel pipeline.\nWorks Nos. 56, 62 and 66\n2/3w\nRequired for construction of a temporary two lane single carriageway; and for the stockpiling of construction materials.\nWork No. 70\n2/3aa\nRequired for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.\nWorks No. 33, 56 and 62\n2/3ab\nRequired for construction of a temporary merge onto the M42 for construction vehicles; and for the stockpiling of construction materials.\nAll Works\n2/10a, 2/10b, 2/11\nRequired for lining and signing works.\nAll Works\n2/62a\nRequired for construction of realigned B4438 Catherine- de- Barnes Lane.\nWork No. 11\n2/65\nRequired for construction of a temporary southbound diverge for construction traffic.\nAll Works\n2/76a\nRequired for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.\nWork No. 68\nLand Plans – Sheet 3\n3/3d, 3/51a, 3/57, 3/58a\nRequired for the stockpiling of construction materials.\nAll Works\n3/4b\nRequired for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.\nWorks No. 33, 56 and 62\n3/4f\nRequired for access to drainage attenuation and treatment systems; and for the stockpiling of construction materials.\nWork No. 33\n3/15a, 3/15c,3/15e\nRequired for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.\nWork No. 68\n3/22a, 3/22b\nTo access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI – Shadowbrook Meadows unit\nWork No. 76\n3/32b, 3/32c\nTo access land in connection with the monitoring of the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.\nAll Works\n3/23, 3/73f\nRequired for construction of diversions to existing utilities apparatus and equipment.\nAll Works\n3/73d\nRequired for construction of diversions to existing utilities apparatus and equipment.\nWork No. 69\nRequired for the provision of a temporary construction compound.\nAll Works\n3/25\nRequired for access to land associated with the provision of environmental mitigation within the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.\nWork No.76\nFor construction of diversions to existing utilities apparatus and equipment.\nAll Works\n3/30\nRequired for access to construct a diversion to a private means of access.\nWork No.17\n3/87a, 3/87b\nRequired for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 57, 64 and 65\nLand Plans – Sheet 4\n4/1a, 4/1i, 4/1ad, 4/1af, 4/1ag, 4/1ah, 4/1ai, 4/1ak, 4/1al, 4/3r, 4/146\nRequired for signage installation.\nAll Works\n4/1c, 4/1bf, 4/3b, 4/3c, 4/3ai, 4/3aj, 4/3s, 4/3x, 4/6n, 4/6p, 4/10\nRequired for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 21, 45 and 59\n4/1d\nRequired for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.\nWork No. 20\n4/1f\nRequired for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 22, 23 and 24\n4/1g\nRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 20 and 22\n4/1h, 4/3ab\nRequired for access to construct a new free flow link road; and for construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 2, 21 and 59\n4/1k\nRequired for the realignment of Public Right of Way M106; and for access and construction of a diversion to an existing medium pressure gas main.\nWorks Nos. 53 and 60\n4/1m, 4/1s, 4/1x, 4/1ap, 4/1bb, 4/3f, 4/3g, 4/62, 4/71, 4/147\nRequired for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.\nWork No. 19\n4/1n\nRequired for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 19 and 60\n4/1p, 4/25c\nRequired for access to monitor existing drainage attenuation features.\nWork No.20\n4/1q, 4/3h, 4/3k, 4/3m\nRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment.\nWork No. 20\n4/1r\nRequired for access to construct a pedestrian overbridge; and for construction of a diversion to a medium pressure gas main.\nWorks Nos. 39 and 60\n4/1t, 4/1u\nRequired for signage installation and the construction of diversions to existing utilities apparatus and equipment.\nWork No.2\n4/1v, 4/1am, 4/3j, 4/3ae, 4/4n, 4/4v, 4/4x, 4/25b, 4/25d, 4/25s, 4/73, 4/76, 4/151, 4/152, 4/153\nRequired for access and construction of diversions to existing utilities apparatus and equipment.\nAll Works\n4/1w, 4/3e; 4/3o, 4/3p, 4/6e, 4/6f, 4/6g, 4/6h, 4/25e, 4/25g, 4/25l, 4/25n, 4/66, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/150, 4/155\nRequired for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.\nWork No. 2\n4/1z\nRequired for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.\nWorks Nos. 20 and 22\n4/1aa, 4/1ab, 4/1ac, 4/1ax, 4/3ad\nRequired for temporary access to construct a realignment of the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.\nWork No. 22\n4/1ao, 4/7b\nRequired for temporary access to construct alterations to the existing Bickenhill Lane carriageway; and for drainage.\nWork No. 24\n4/1aq, 4/1bc\nRequired for access and construction of a realignment to an existing private means of access; and for access and construction of environmental mitigation; and for monitoring of attenuation devices.\nWork No. 21\n4/1as\nRequired for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.\nWork No. 2\n4/1az, 4/1ba\nRequired for access and construction of a diversion to an existing aqueduct pipeline.\nWork No. 63\n4/2a, 4/2b, 4/2c, 4/2d, 4/3af,\nRequired for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 57, 64 and 65\n4/25f\nRequired for access and construction of improvements to the eastbound and westbound carriageway of the A45; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 2, 57, 64 and 65\n4/3d\nRequired for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange; and for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 20, 22, 23 and 24\n4/3i, 4/3l\nRequired for access and construction of diversions to existing utilities apparatus and equipment.\nWork Nos. 2 and 20\n4/3n\nRequired for temporary access to construct improvements to the existing Clock Interchange.\nWork No. 20\n4/3u, 4/3v, 4/3ag\nRequired for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 26, 57, 64 and 65\n4/3y\nRequired for access and construction of improvements to the existing Clock Interchange; and for construction of a new free flow link road; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.\nWorks Nos. 20 and 21\n4/3ah, 4/4u, 4/25q, 4/25u, 4/160\nRequired for access to and construction of a diversion to an existing aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.\nWork No. 63\n4/4g, 4/4k\nRequired for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 53 and 69\n4/4w\nRequired for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for access and construction of a diversion to an existing aqueduct pipeline; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 53, 63 and 69\n4/6a\nRequired for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of a diversion to an existing aqueduct pipeline; and for construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 21, 45, 59 and 63\n4/6b\nRequired for access and construction of diversions to existing electric lines, cables, equipment and apparatus; and for access and construction of an extension to an existing culvert.\nWorks Nos. 57, 64 and 65\n4/6d\nRequired for construction of a pedestrian overbridge; and for access and construction of a diversion to an existing medium pressure gas main; and for access and construction of an extension to an existing culvert; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.\nWorks Nos. 39, 57, 60, 64 and 65\n4/7a\nRequired for alterations to the existing Bickenhill Lane carriageway; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.\nWorks Nos. 23 and 24\n4/9\nRequired for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for access and construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 2 and 59\n4/11b\nRequired for access to construct a pedestrian overbridge across the A45.\nWork No. 39\n4/25a, 4/69, 4/80\nRequired for access and construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.\nWork No. 20\n4/11a, 4/25i, 4/25m\nRequired for access and construction of a cantilever gantry; and for lining and signing; and for access and construction of diversions to existing utilities apparatus and equipment.\nWork No. 2\n4/25j, 4/25o and 4/25p\nRequired for construction of a cantilever gantry and demolition of a portal gantry; and for access and construction of a pedestrian overbridge; and for lining and signing works; and for access and construction of diversions to existing utilities equipment and apparatus.\nWorks Nos. 2 and 39\n4/59\nRequired for lining and signing; and for access to and construction of a new free flow link road; and for access to and construction of a realignment to a private means of access.\nWorks Nos. 2 and 21\n4/82\nRequired for lining and signing works; and for access to and construction of a pedestrian overbridge; and for access to and construction of a diversion to an existing medium pressure gas main; and access to and construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 2, 39 and 60\n4/149\nRequired for lining and signing works; and for access to and construction of a diversion to an aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 2 and 63\n4/156\nRequired for lining and signing works; and for access to and construction of a new free flow link; and for access to and construction of a footway/cycleway; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 2, 21, 45, 59 and 63\n4/158, 4/159\nRequired lining and signing in connection with Airport Way connector road; and for access to and construction of a free flow link road; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.\nWorks Nos. 21 and 59\nLand Plans – Sheet 5\n5/1a, 5/1b\nRequired for access to and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 57, 64 and 65\n5/7\nRequired for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.\nWork No. 2\n5/29b, 5/29c, 5/29h, 5/29t, 5/29u and 5/29y\nRequired for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.\nWorks Nos. 26, 57, 64 and 65\n5/29p, 5/29r\nRequired for removal of existing East Way Roundabout.\nWork No. 30(a)\n5/62\nRequired for lining and signing works.\nWork No. 31\nLand Plans – Sheet 6\n6/2c\nRequired for access to and construction of a new free flow single carriageway.\nWork No. 26",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 10 in force at 11.6.2020, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/528/schedule/10",
    "retrieved_at": "2026-10-28T22:30:10.662738+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}