# The M42 Junction 6 Development Consent Order 2020, Schedule 10: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W

(1)
Plot reference Number shown on Land Plans
(2)
Purpose for which temporary possession may be taken
(3)
Relevant part of the authorised development
Land Plans – Sheet 2
2/3z, 2/58a, 2/58b, 2/59
Required for provision of a temporary construction compound.
Works Nos. 3 ,6 and 70
2/52
Temporary possession associated with the Solihull Road Overbridge and temporary alignments to ensure Solihull road remains open.
Work Nos. 3 and 70
2/2a
Required for the provision of temporary access to facilitate the construction works
Work Nos. 1 and 5
2/2c
Required for construction of a diversion to an existing local high pressure gas main; and to provide temporary access to land associated with the provision of environmental mitigation.
Work No. 55
2/3a
Required for construction of a new M42 off slip road and the demolition of an existing sheet pile wall.
Work No. 4
2/3c
Required for storage of earthworks and for the construction of a diversion to an existing local high pressure gas main.
Works Nos. 3 and 55
2/3d
Required for construction of a new M42 off slip road and the demolition of an existing sheet pile wall and to provide temporary access to land associated with environmental mitigation.
Work No. 4
2/3g, 2/3h, 2/3i, 2/3j, 2/3p, 2/3r, 2/22
Required to provide temporary access to land associated with the provision of environmental mitigation.
Work Nos. 3, 4 and 5
2/3o, 2/10c, 2/29, 2/30
Required for construction of diversions to existing utilities apparatus and equipment.
Work No. 3
2/3u, 2/3ah
Required for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for construction of a reinforced cover slab for an existing fuel pipeline.
Works Nos. 56, 62 and 66
2/3w
Required for construction of a temporary two lane single carriageway; and for the stockpiling of construction materials.
Work No. 70
2/3aa
Required for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.
Works No. 33, 56 and 62
2/3ab
Required for construction of a temporary merge onto the M42 for construction vehicles; and for the stockpiling of construction materials.
All Works
2/10a, 2/10b, 2/11
Required for lining and signing works.
All Works
2/62a
Required for construction of realigned B4438 Catherine- de- Barnes Lane.
Work No. 11
2/65
Required for construction of a temporary southbound diverge for construction traffic.
All Works
2/76a
Required for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.
Work No. 68
Land Plans – Sheet 3
3/3d, 3/51a, 3/57, 3/58a
Required for the stockpiling of construction materials.
All Works
3/4b
Required for access to drainage attenuation and treatment systems; for construction of diversions to an existing local high pressure gas main and an existing aqueduct pipeline; and for the stockpiling of construction materials.
Works No. 33, 56 and 62
3/4f
Required for access to drainage attenuation and treatment systems; and for the stockpiling of construction materials.
Work No. 33
3/15a, 3/15c,3/15e
Required for temporary access to land associated with alteration works to the existing Warwickshire Gaelic Athletic Association facilities.
Work No. 68
3/22a, 3/22b
To access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI – Shadowbrook Meadows unit
Work No. 76
3/32b, 3/32c
To access land in connection with the monitoring of the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.
All Works
3/23, 3/73f
Required for construction of diversions to existing utilities apparatus and equipment.
All Works
3/73d
Required for construction of diversions to existing utilities apparatus and equipment.
Work No. 69
Required for the provision of a temporary construction compound.
All Works
3/25
Required for access to land associated with the provision of environmental mitigation within the Bickenhill Meadows SSSI – Shadowbrook Meadows unit.
Work No.76
For construction of diversions to existing utilities apparatus and equipment.
All Works
3/30
Required for access to construct a diversion to a private means of access.
Work No.17
3/87a, 3/87b
Required for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 57, 64 and 65
Land Plans – Sheet 4
4/1a, 4/1i, 4/1ad, 4/1af, 4/1ag, 4/1ah, 4/1ai, 4/1ak, 4/1al, 4/3r, 4/146
Required for signage installation.
All Works
4/1c, 4/1bf, 4/3b, 4/3c, 4/3ai, 4/3aj, 4/3s, 4/3x, 4/6n, 4/6p, 4/10
Required for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 21, 45 and 59
4/1d
Required for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.
Work No. 20
4/1f
Required for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 22, 23 and 24
4/1g
Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 20 and 22
4/1h, 4/3ab
Required for access to construct a new free flow link road; and for construction of a diversion to an existing medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 2, 21 and 59
4/1k
Required for the realignment of Public Right of Way M106; and for access and construction of a diversion to an existing medium pressure gas main.
Works Nos. 53 and 60
4/1m, 4/1s, 4/1x, 4/1ap, 4/1bb, 4/3f, 4/3g, 4/62, 4/71, 4/147
Required for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.
Work No. 19
4/1n
Required for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 19 and 60
4/1p, 4/25c
Required for access to monitor existing drainage attenuation features.
Work No.20
4/1q, 4/3h, 4/3k, 4/3m
Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment.
Work No. 20
4/1r
Required for access to construct a pedestrian overbridge; and for construction of a diversion to a medium pressure gas main.
Works Nos. 39 and 60
4/1t, 4/1u
Required for signage installation and the construction of diversions to existing utilities apparatus and equipment.
Work No.2
4/1v, 4/1am, 4/3j, 4/3ae, 4/4n, 4/4v, 4/4x, 4/25b, 4/25d, 4/25s, 4/73, 4/76, 4/151, 4/152, 4/153
Required for access and construction of diversions to existing utilities apparatus and equipment.
All Works
4/1w, 4/3e; 4/3o, 4/3p, 4/6e, 4/6f, 4/6g, 4/6h, 4/25e, 4/25g, 4/25l, 4/25n, 4/66, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/150, 4/155
Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.
Work No. 2
4/1z
Required for access to and over land to be used for construction of improvements to the existing Clock Interchange; and for access to and over land to be used for the construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.
Works Nos. 20 and 22
4/1aa, 4/1ab, 4/1ac, 4/1ax, 4/3ad
Required for temporary access to construct a realignment of the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road.
Work No. 22
4/1ao, 4/7b
Required for temporary access to construct alterations to the existing Bickenhill Lane carriageway; and for drainage.
Work No. 24
4/1aq, 4/1bc
Required for access and construction of a realignment to an existing private means of access; and for access and construction of environmental mitigation; and for monitoring of attenuation devices.
Work No. 21
4/1as
Required for lining and signing works; and for construction of diversions to existing utilities apparatus and equipment.
Work No. 2
4/1az, 4/1ba
Required for access and construction of a diversion to an existing aqueduct pipeline.
Work No. 63
4/2a, 4/2b, 4/2c, 4/2d, 4/3af,
Required for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 57, 64 and 65
4/25f
Required for access and construction of improvements to the eastbound and westbound carriageway of the A45; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 2, 57, 64 and 65
4/3d
Required for construction of improvements to the existing Clock Interchange; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange; and for construction of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road; and for alterations to the existing Bickenhill Lane carriageway; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 20, 22, 23 and 24
4/3i, 4/3l
Required for access and construction of diversions to existing utilities apparatus and equipment.
Work Nos. 2 and 20
4/3n
Required for temporary access to construct improvements to the existing Clock Interchange.
Work No. 20
4/3u, 4/3v, 4/3ag
Required for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 26, 57, 64 and 65
4/3y
Required for access and construction of improvements to the existing Clock Interchange; and for construction of a new free flow link road; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.
Works Nos. 20 and 21
4/3ah, 4/4u, 4/25q, 4/25u, 4/160
Required for access to and construction of a diversion to an existing aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.
Work No. 63
4/4g, 4/4k
Required for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 53 and 69
4/4w
Required for provision of a temporary construction compound, [to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste]; and for access and construction of a diversion to an existing aqueduct pipeline; and for the realignment of Public Right of Way M106; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 53, 63 and 69
4/6a
Required for construction of a new free flow link road; and for the construction of a footway/cycleway; and for the construction of a diversion to an existing medium pressure gas main; and for construction of a diversion to an existing aqueduct pipeline; and for construction of diversions to existing utilities apparatus and equipment.
Works Nos. 21, 45, 59 and 63
4/6b
Required for access and construction of diversions to existing electric lines, cables, equipment and apparatus; and for access and construction of an extension to an existing culvert.
Works Nos. 57, 64 and 65
4/6d
Required for construction of a pedestrian overbridge; and for access and construction of a diversion to an existing medium pressure gas main; and for access and construction of an extension to an existing culvert; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.
Works Nos. 39, 57, 60, 64 and 65
4/7a
Required for alterations to the existing Bickenhill Lane carriageway; and for the construction of diversions to existing electric lines, cables, equipment and apparatus.
Works Nos. 23 and 24
4/9
Required for lining and signing works; and for access and construction of a diversion to a medium pressure gas main; and for access and construction of diversions to existing utilities apparatus and equipment.
Works Nos. 2 and 59
4/11b
Required for access to construct a pedestrian overbridge across the A45.
Work No. 39
4/25a, 4/69, 4/80
Required for access and construction of improvements to the existing Clock Interchange; and for construction of diversions to existing utilities apparatus and equipment; and for access to environmental mitigation to be constructed, maintained and retained at the existing Clock Interchange.
Work No. 20
4/11a, 4/25i, 4/25m
Required for access and construction of a cantilever gantry; and for lining and signing; and for access and construction of diversions to existing utilities apparatus and equipment.
Work No. 2
4/25j, 4/25o and 4/25p
Required for construction of a cantilever gantry and demolition of a portal gantry; and for access and construction of a pedestrian overbridge; and for lining and signing works; and for access and construction of diversions to existing utilities equipment and apparatus.
Works Nos. 2 and 39
4/59
Required for lining and signing; and for access to and construction of a new free flow link road; and for access to and construction of a realignment to a private means of access.
Works Nos. 2 and 21
4/82
Required for lining and signing works; and for access to and construction of a pedestrian overbridge; and for access to and construction of a diversion to an existing medium pressure gas main; and access to and construction of diversions to existing utilities apparatus and equipment.
Works Nos. 2, 39 and 60
4/149
Required for lining and signing works; and for access to and construction of a diversion to an aqueduct pipeline; and for access to and construction of diversions to existing utilities apparatus and equipment.
Works Nos. 2 and 63
4/156
Required for lining and signing works; and for access to and construction of a new free flow link; and for access to and construction of a footway/cycleway; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.
Works Nos. 2, 21, 45, 59 and 63
4/158, 4/159
Required lining and signing in connection with Airport Way connector road; and for access to and construction of a free flow link road; and for access to and construction of a diversion to a medium pressure gas main; and for access to and construction of diversions to existing utilities apparatus and equipment.
Works Nos. 21 and 59
Land Plans – Sheet 5
5/1a, 5/1b
Required for access to and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 57, 64 and 65
5/7
Required for lining and signing works; and for access and construction of diversions to existing utilities apparatus and equipment.
Work No. 2
5/29b, 5/29c, 5/29h, 5/29t, 5/29u and 5/29y
Required for access to construct a new free flow single carriageway with hard shoulder; and for access and construction of diversions to an existing local high pressure gas main and existing electric lines, cables, equipment and apparatus.
Works Nos. 26, 57, 64 and 65
5/29p, 5/29r
Required for removal of existing East Way Roundabout.
Work No. 30(a)
5/62
Required for lining and signing works.
Work No. 31
Land Plans – Sheet 6
6/2c
Required for access to and construction of a new free flow single carriageway.
Work No. 26

---
Source: https://www.legislation.gov.uk/uksi/2020/528/schedule/10 (the official version)