{
  "url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020/schedule-8",
  "json_url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020/schedule-8.json",
  "legislation": "uksi/2020/528",
  "legislation_title": "The M42 Junction 6 Development Consent Order 2020",
  "legislation_url": "https://openlegislation.uk/m42-junction-6-development-consent-order-2020",
  "path": "schedule/8",
  "kind": "schedule",
  "number": "8",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
  "text": "(1)\nPlot Reference Number shown on Land Plans\n(2)\nPurpose for which rights over land may be acquired\nLand Plans – Sheet 2\n2/2c, 2/3c\nTo construct, operate, access and maintain a diversion to an existing local high pressure gas main (Work No. 55).\n2/3o, 2/10c, 2/29, 2/30\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 3).\n2/3u, 2/3ah\nTo construct, operate, access and maintain diversion to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).\nTo construct, operate, access and maintain a reinforced cover slab for an existing fuel pipeline (Work No. 66) and to maintain access to the pipeline.\n2/3aa\nTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).\nLand Plans – Sheet 3\n3/4b\nTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 56) and an existing aqueduct pipeline (Work No. 62).\n3/4f\nTo access land to be used for the construction, operation and maintenance of drainage attenuation and treatment systems (Work No. 33).\n3/22a, 3/22b\nTo access land to be used in connection with the provision, maintenance and retention of mitigation within Bickenhill Meadows SSSI - Shadowbrook Meadows unit (Work No.76).\n3/23, 3/73d, 3/73f\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n3/25\nTo access land to be used for the provision, maintenance and retention of mitigation in connection with Bickenhill Meadows site of special scientific interest (works associated with the authorised development).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n3/87a\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).\nLand Plans – Sheet 4\n4/1c, 4/1bf, 4/3b, 4/3c, 4/3s, 4/3x, 4/3ai, 4/3aj, 4/6n, 4/6p, 4/9, 4/10, 4/158, 4/159\nTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/1d, 4/25a\nTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).\n4/1f\nTo access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).\nTo take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/1g\nTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).\nTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/1h, 4/1m, 4/1q, 4/1s, 4/1t, 4/1u, 4/1v, 4/1w, 4/1x, 4/1am, 4/1ap, 4/1as, 4/1bb, 4/3e. 4/3f, 4/3g, 4/3h, 4/3j, 4/3k, 4/3m, 4/3ab, 4/3ae, 4/4g, 4/4n, 4/4v, 4/4x, 4/6b, 4/6e, 4/6f, 4/6g, 4/6h, 4/7a, 4/11a, 4/25b, 4/25d, 4/25e, 4/25g, 4/25i, , 4/25l, 4/25m, 4/25s, 4/62, 4/66, 4/69, 4/71, 4/73, 4/76, 4/80, 4/89, 4/91, 4/93, 4/94, 4/99, 4/102, 4/106, 4/109, 4/147, 4/150, 4/151, 4/152, 4/153, 4/155\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/1k\nTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).\n4/25o, 4/25j, 4/25p, 4/25n\nTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39 and the installation of a new gantry (Work No. 2)).\n4/1n, 4/1r, 4/82\nTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).\nTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/lz\nTo take access to and over land to be used for the construction, operation and maintenance of improvements to the existing Clock Interchange (Work No. 20).\nTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).\n4/1ab, 4/1ac\nTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).\n4/1aq, 4/1bc\nTo construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).\n4/1az, 4/1ba\nTo construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).\n4/2a, 4/3af\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).\n4/3d\nTo take access to and over land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).\nTo take access to and over land to be used for the construction, operation and maintenance of a realignment to the existing single carriageway A45 Eastbound to Bickenhill Lane free flow link road (Work No. 22).\nTo take access to and over land to be used for the construction, operation and maintenance of alterations to the existing Bickenhill Lane carriageway (Works Nos. 23 and 24).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/3i, 4/3l\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Works Nos. 2 and 20).\n4/3o, 4/3p\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 2).\n4/3y\nTo access land to be used for the construction, maintenance and retention of environmental mitigation at the existing Clock Interchange (works associated with Work No. 20).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).\n4/3ah, 4/4k, 4/4u, 4/4w, 4/25q, 4/25u, 4/149, 4/160\nTo construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/6a, 4/156\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with Work No. 21).\nTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 59).\nTo construct, operate, access and maintain a diversion to an existing aqueduct pipeline (Work No. 63).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).\n4/6d\nTo access land to be used for the construction, operation and maintenance of a pedestrian overbridge (Work No. 39).\nTo construct, operate, access and maintain a diversion to an existing medium pressure gas main (Work No. 60).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (Works Nos. 56, 64 and 65).\n4/25f\nTo construct, operate, access and maintain a gantry forming part of Work No. 2a\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).\n4/59\nTo construct, operate, access and maintain a realignment to a private means of access due to the construction of a new free flow link road at Work No. 21 (works associated with the authorised development).\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with authorised development).\nLand Plans – Sheet 5\n5/1b, 5/29h,\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).\n5/29c, 5/2h and 5/29u\nRequired for access to and construction of a new free flow single carriageway (Work No.26).\nTo construct, operate, access and maintain diversions to an existing local high pressure gas main (Work No. 57) and existing electric lines, cables, equipment and apparatus (Works Nos. 64 and 65).\n5/7\nTo construct, operate, access and maintain diversions to existing utilities apparatus and equipment (works associated with the authorised development).",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 8 in force at 11.6.2020, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/528/schedule/8",
    "retrieved_at": "2026-10-28T22:30:10.662738+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}