# The M48 Motorway (Severn Bridge Crossing) (Temporary Prohibition and Restriction of Traffic) Order 2026, Introduction: Introductory text


Road Traffic, England
Made 2nd July 2026
Coming into force 6th July 2026
The Secretary of State for Transport, being the traffic authority for the Severn Bridge Crossing on the M48 motorway and in exercise of the powers conferred by sections 2(1), (2)(a), and (b), 4(1), 14(1)(a), (4), (5) and (7), 17 and 88 of the Road Traffic Regulation Act 1984() (“the Act”), makes the following Order.
In accordance with section 14(1)(a) of the Act, the Secretary of State is satisfied that traffic on the lengths of road specified in this Order should be restricted because works are proposed to be executed on the M48 motorway.
The Secretary of State has also had regard to the existence of alternative routes suitable for the traffic which will be affected by this Order in accordance with section 14(3) of the Act.

---
Source: https://www.legislation.gov.uk/uksi/2026/736/introduction (the official version)
Page: https://openlegislation.uk/m48-motorway-severn-bridge-crossing-temporary-prohibition-and-restriction-of-traffic-order-2026/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

